Office of Operations
21st Century Operations Using 21st Century Technologies

Volume VII: Predicting Performance with Traffic Analysis Tools

U.S. Department of Transportation
Federal Highway Administration


March 2008

Download the Printable Version [PDF, 1.7MB]
You will need the Adobe Acrobat Reader to view this PDF.
Contact Information: Operations Feedback at OperationsFeedback@dot.gov.
Traffic Analysis Tools Web Site



[ Quality Assurance Statement ] [ Form DOT F 1700.7 ] [ List of Figures and Tables ]
empty cell
empty cell
CASE STUDY 1 I-494 AND TRUNK HIGHWAY 7 IN MINNEAPOLIS, MINNESOTA
empty cell Project Description
empty cell Analysis and Results
empty cell Conclusions and Recommendations
empty cell Extensions and Guidance
CASE STUDY 2 I-15 RECONSTRUCTION IN OGDEN, UTAH
empty cell Project Description
empty cell Analysis and Results
empty cell Conclusions and Recommendations
empty cell Extensions and Guidance
CASE STUDY 3 S.R. 826-PALMETTO EXPRESSWAY INTERCHANGE OPERATIONAL ANALYSIS REPORT, FLORIDA
empty cell Project Description
empty cell Analysis and Results
empty cell Conclusions and Recommendations
empty cell Extensions and Guidance
CASE STUDY 4 I-25 AND UNIVERSITY BOULEVARD IN DENVER, COLORADO
empty cell Project Description
empty cell Analysis and Results
empty cell Conclusions and Recommendations
empty cell Extensions and Guidance
CASE STUDY 5 CHICAGO STREET NETWORK
empty cell Project Description
empty cell Analysis and Results
empty cell Conclusions and Recommendations
empty cell Cross-Cutting Findings
empty cell PRACTICAL GUIDANCE ON THE APPLICATION OF TRAFFIC SIMULATION AND ANALYSIS TOOLS FOR TRANSPORTATION-INVESTMENT DECISIONS

United States Department of Transportation Federal Highway Administration

FHWA Office of Operations, HOTM

1200 New Jersey Avenue, SE
Washington, DC 20590

http://ops.fhwa.dot.gov

FHWA-HOP-08-055
March 2008

Office of Operations