Office of Operations
21st Century Operations Using 21st Century Technologies

List of Figures and Tables

List of Figures

Figure 10 MNDOT's Peak Hour Simulation Estimates versus Actual Conditions
Figure 2 Historical AADTs and Reduction Factor
Figure 3 I-494 and TH7 Interchange Detector Locations
Figure 4 I-494 and I-394 Interchange Detector Locations
Figure 5 LOS Observations by 15 Minute Time Period
Figure 6 I-15 Corridor in Ogden, Utah
Figure 7 SR 826/Palmetto Expressway at NW 67th (Left) and NW 57th Avenue (Right)
Figure 8 Existing Conditions Geometry (EB Improvement Project Post-Construction)
Figure 9 Year 2000 (Pre-Construction) A.M. and P.M. Peak Hour Traffic Volumes
Figure 10 I-25 Interchange in Denver, Colorado
Figure 11 Test Bed Network
Figure 12 Evaluation Steps


List of Tables

Table 1 MNDOT's Peak Hour Simulation Estimates versus Actual Conditions
Table 2 Historical AADTs and Reduction Factor
Table 3 Year 2000 (Pre-Construction) and Year 2004 (Post-Construction) Comparison Freeway Ramp Merge / Diverge Analysis Derived from the HCM
Table 4 Year 2000 (Pre-Construction and Year 2004 (Post-Construction) Comparison A.M. and P.M. Peak Hour Freeway Mainline Micro-simulation Analysis Summary
Table 5 Year 2000 (Pre-Construction and Year 2004 (Post-Construction) Comparison A.M. and P.M. Peak Hour Freeway Mainline HCM Analysis Summary
Table 6 Simulation-Generated Delay and Levels of Service
Table 7 HCM-Generated Delay and Levels of Service
Table 8 Δ Model Compared with Δ Field
Table 9 LOS Designation in the Highway Capacity Manual (1994)
Table 10 Comparison of Findings by Site