Contents
1.0 Purpose of This Transportation Management Plan
4.0 Transportation Management Plan Summary
5.0 Roles and Responsibilities
5.1 Resident Engineer (RE)
5.2 District Traffic Manager (DTM)
5.3 Project Manager (PM)
5.4 Public Information Officer (PIO)
5.5 Construction Advisory Team (CAT)
6.0 Motorist Information Strategy
6.1 Portable Changeable Message Signs
6.2 Fixed Changeable Message Signs
6.3 Ground Mounted Signs
6.4 Caltrans Highway Information Network
6.5 Highway Advisory Radio
6.6 511 Traveler Information Systems
6.7 www.FixI-5.com Website
6.8 ITS For Traffic Monitoring
6.9 Freight Travel Information
7.1 Construction Zone Enhanced Enforcement Program
7.2 Access of Emergency Service During Closures
7.3 Freeway Service Patrol
7.4 Caltrans Transportation Management Center (TMC)
7.5 Traffic Surveillance Stations (Loop Detectors and CCTV)
8.0 Construction TMP Strategies
8.1 Lane Closure Chart
8.2 Incentive Clause/Disincentive Clause
8.3 Damage Clause
8.4 A+B Bidding
8.5 Project Coordination
10.0 Corridor/Network Management Strategies
10.1 Truck Restriction
10.2 Signal Timing/Coordination Improvements
10.3 TMP Effectiveness Monitoring
11.0 Alternate Route Strategies
12.0 Public Information/Public Awareness Campaign
12.1 Brochures and Mailer
12.2 Press Releases
12.3 Emergency Hot-line for the Local Public
12.4 Paid Advertising
13.0 Contractor & Caltrans Traffic Emergency Contingency Plan
13.1 Contractor's Responsibilities
13.2 Contingency Plans
13.3 Communication Plan
13.4 TMC Response Protocol
Attachment A. Construction Advisory Team (CAT)