This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document.
The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers' names appear in this report only because they are considered essential to the objective of the document.
The Federal Highway Administration (FHWA) provides high-quality information to serve Government, industry, and the public in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement.
1. Report No.
FHWA-HOP-14-019
|
2. Government Accession No.
|
3. Recipient's Catalog No.
|
4. Title and Subtitle
Active Traffic Management (ATM) Feasibility and Screening Guide
|
5. Report Date
May 2015
|
6. Performing Organization Code
|
7. Author(s)
Louis Neudorff, Keith McCabe
|
8. Performing Organization Report No.
|
9. Performing Organization Name and Address
CH2M HILL
901 New York Ave NW, Suite 4000 East
Washington, DC 20001
Under contract to Kittelson and Associates, Inc.
|
10. Work Unit No. (TRAIS)
|
11. Contract or Grant No.
DTFH61-12-D-00049-T13003
|
12. Sponsoring Agency Name and Address
United States Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
|
13. Type of Report and Period Covered
Final Report
|
14. Sponsoring Agency Code
HOP
|
15. Supplementary Notes
The Task Manager for FHWA is James Colyar.
|
16. Abstract
Active Traffic Management (ATM) concepts, strategies, and supporting technologies have been receiving significant attention given the potential operational benefits that have and can potentially accrue from deploying these strategies. Implementing these ATM concepts and strategies can also involve significant capital costs, followed by ongoing operations and maintenance requirements. As such, some or all ATM strategies may not be cost effective for certain segments and links of the surface transportation network.
The Active Traffic Management Feasibility and Screening Guide was developed to assist transportation agencies and planning organizations in making informed investment decisions regarding ATM by determining the feasibility of ATM strategies before committing significant resources towards any subsequent project development and design activities. The Guide was based on an extensive review of literature and This Guide, coupled with interviews with several practitioners who have been directly involved in the feasibility analyses, design, deployment, and/or operation of ATM strategies. It presents a recommended process for agencies to follow as they consider ATM deployment at the feasibility and screening analyses level. Following the guidance will help practitioners to identify specific roadway segments most suited for ATM and the appropriate strategies, and the expected costs and range of benefits.
|
17. Key Words
active traffic management, adaptive ramp metering, adaptive signal control, dynamic junction control, dynamic lane assignment, dynamic lane reversal, dynamic merge control, dynamic shoulder lane, dynamic speed limit, queue warning, transit signal priority
|
18. Distribution Statement
No restrictions.
|
19. Security Classification (of this report)
Unclassified
|
20. Security Classification (of this page)
Unclassified
|
21. No of Pages
113
|
22. Price
Free
|