SIGNAL TIMING UNDER SATURATED CONDITIONS
PDF Version [PDF 2.7 MB]
To view PDF files, you need the Adobe
Acrobat Reader.
Contact Information: Operations Feedback at OperationsFeedback@dot.gov.
Table of Contents
Notice
Documentation Page
Acknowledgments
Guidance
About This Document
Objectives
Traditional Objectives
Maximizing Throughput
Queue Management
Strategies
Guidance from Experts
Cycle Length and Green Time
Buses
1. Literature Review
Overview
Annotated Bibliography
Foundational Research
Optimization Model Research
Network Metering
Genetic Algorithms
MCH1542 B Installation Guide for MOVA
Red Clearances
References
Overview of NCHRP 3-66
References for NCHRP 3-66 Discussion
2. The State of the Practice
Categorizing Congestion Based on Operational Objectives
Example Applications
Example 1. Square Lake Road at Telegraph Road, Oakland County, Michigan
Example 2. Sunrise Boulevard, Rancho Cordova, California
Example 3. North Carolina State Highway 54 and I-40, Durham, NC
Example 4. Bandera Road and Guilbeau Road, San Antonio, Texas
State-of-the-Practice Interviews
Definition of Saturation
Motivating Conditions
Strategies Taken, and Their Objectives
Demons
Tactics and Controller Features
Desired Controller Features
3. Evaluation of Strategies
Long Green Times and Cycles
Introduction
Study Site
Field Data
Analysis of Field Data
Field Data Conclusions and Further Discussion
Simulation
Discussion and Conclusion
Cycle Length and Bus Capacity
Introduction
Modeled Operation
Simulation
Simulation Results
Conclusion
1200 New Jersey Avenue, SE
Washingtion, DC 20590
November 2008
Publication Number: FHWA-HOP-09-008
Task Order Under Contract Number: DTFH61-06-D-00006