Skip to content
U.S. Department of Transportation
No Value

Applying Analysis Tools in Planning for Operations -

Case Study #3 – Using Archived Data As a Tool for Operations Planning

Table of Contents

Case Study Introduction

Case Study Objectives

Participating Agency and Project Background

Case Study Procedures

Case Study Outcomes

Conclusions

List of Figures

Figure 1. Analytical Methods/Tools and Related Case Studies Developed Under this Project

Figure 2. FPI Study Corridors

Figure 3. PeMS On-line System

Figure 4. MTC 511 System

Figure 5. HICOMP Congestion Map

Figure 6. Mobility–Travel Time

Figure 7. Mobility–Speed Contour Plot

Figure 8. Mobility–Probe Vehicle Runs

Figure 9. Mobility–Average Weekday Hourly Delay

Figure 10. Mobility–Average Daily Delay

Figure 11. Bottleneck Locations

Figure 12. Reliability–Buffer Index

Figure 13. Safety–Accidents by Month

Figure 14. Safety–Accident Rates

Figure 15. Productivity–Lost Productivity

Figure 16. Productivity–Average Lost Lane Miles

Figure 17. Detection Coverage

List of Tables

Table 1. TASAS–Accidents and Accident Rate

previous | next