ITS Architecture Implementation Program
time lapse of traffic traveling down and exiting from a freeway at night
21st Century Operations Using twenty-first Century Technologies

6.4 Track 3: Expand ITS

The projects identified in this section are intended to expand the coverage of existing systems, and to add new ITS functions and services regionally. They include ITS on freeways, several transit projects, emergency vehicle pre-emption at traffic signals within the City of Cincinnati, snow and ice detection and advanced snow plows for improved snow and ice operations, parking management, and safety projects. The projects that have a defined geographic scope are illustrated on Figures 6-2A and 6-2B. To expand ITS, the following fifteen projects were identified:

15. ARTIMIS Field Device and Communications Expansion
(shown on Figures 6-2A and 6-2B)
16. Complete 1/10th Freeway Reference Markers Coverage
(shown on Figures 6-2A and 6-2B)
17. Highway-Rail Intersection Advanced Safety System
18. METRO/TANK Transit Itinerary Planning System
19. METRO Advanced Para-Transit Scheduling and Dispatch System
20. TANK Advanced Para-Transit Scheduling and Dispatch System
21. Ramp Metering on I-75 within the City of Cincinnati
22. Bus Traffic Signal Priority
23. Real-Time Transit Arrival Information System
24. Truck-Oriented Traveler Information System
25. Emergency Vehicle Pre-Emption on City of Cincinnati Traffic Signals
(shown on Figures 6-2A and 6-2B)
26. Bridge Snow and Ice Detection
27. Research Program/Downhill Speed Detection Field Test on I-71/I-75
(shown on Figures 6-2A and 6-2B)
28. Advanced Snow Plows
29. Parking Management System Around Stadiums
30. Red Light Enforcement

The tables following Figures 6-2A and 6-2B provide additional detail on the projects in Track 3.

Figure 6-2A. Track 3: Expand ITS (Ohio)
Figure 6-2A. Track 3: Expand ITS (Ohio)
Figure 6-2B. Track 3: Expand ITS (Kentucky)
Figure 6-2B. Track 3: Expand ITS (Kentucky)

 

TRACK 3: EXPAND
Project 15: ARTIMIS Field Device Expansion (Part 1 – Kentucky)
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky ARTIMIS Freeway Field Device and Communications Expansion Extend ARTIMIS field devices and communications on freeway system.
  • I-471 River to I-275
  • I-275: River to River
  • I-71/75: U.S. 42 Interchange south to I-71/75 split
Implement empty cell $18,500,000 empty cell

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

1. Better management of congestion caused by incidents on freeways and major arterials
2. Alleviate peak hour traffic congestion
3. Reduce the length of time that crashes block roadways
5. Reduce the length of time that crashes block roadways
7. Apply lessons learned from current ITS applications to maximize the benefits of existing systems
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 15: ARTIMIS Field Device Expansion (Part 2 – Ohio)
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Ohio ARTIMIS Freeway Field Device and Communications Expansion Extend ARTIMIS field devices and communications on freeway system. Target the installation to meet needs. Full instrumentation may not be required. empty cell empty cell $18,500,000 empty cell
empty cell
  • I-275: SR 4 to river
Implement empty cell empty cell empty cell
empty cell
  • I-275: SR 3 to SR 28
Implement empty cell empty cell empty cell
empty cell
  • I-275: SR 28 to river
empty cell Implement empty cell empty cell
empty cell
  • Ronald Reagan Highway: I-75 to I-275
Implement empty cell $40,500,000 $10,500,000
empty cell
  • I-74: I-75 Interchange to I-74/I-275 easternmost interchange
Implement empty cell empty cell empty cell
empty cell
  • I-74: I-275 to New Haven Interchange
empty cell Implement empty cell empty cell
empty cell
  • I-75: I-275 to SR 63
Implement empty cell empty cell empty cell
empty cell
  • I-71: I-275 to Kings Mill Rd. (SR 741)
Implement empty cell empty cell empty cell
empty cell
  • SR 562: I-75 to I-71
Implement empty cell empty cell empty cell
empty cell
  • Ronald Reagan Highway: I-75 to I-71
Implement empty cell empty cell empty cell

 

TRACK 3: EXPAND
Project 16: Complete 1/10th Freeway Reference Markers Coverage
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky 1/10th mile Reference Markers Complete freeway system reference marker coverage. Implement empty cell $150,000 empty cell
Ohio 1/10th mile Reference Markers Complete freeway system reference marker coverage. Implement empty cell $480,000 empty cell

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 17: Highway-Rail Intersection Advanced Safety Systems
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky Highway-Rail Intersection Advanced Safety Systems Install Advanced Highway-Rail Safety Systems at key crossings. A study must be conducted to identify the crossings and the preferred system. Implement one site Implement one site $500,000* $500,000*
Ohio Highway-Rail Intersection Advanced Safety Systems Install Advanced Highway-Rail Safety Systems at key crossings. A study must be conducted to identify the crossings and the preferred system. Implement one site Implement one site $500,000* $500,000*
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 18: METRO/TANK Transit Itinerary Planning System
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky Develop METRO/TANK Transit Schedule and Itinerary Planning System Install a system that enables phone-based, operator assisted, or on-line transit itinerary planning in real time, and schedule browsing. Project Assumes TANK would serve as project manager. Implement empty cell $1,500,000* $500,000*
Ohio Develop METRO/TANK Transit Schedule and Itinerary Planning System Install a system that enables phone-based, operator assisted, or on-line transit itinerary planning in real time, and schedule browsing. Project Assumes TANK would serve as project manager. Implement empty cell $1,000,000* $500,000*
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 19: METRO Advanced Para-Transit Scheduling and Dispatch System
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Ohio METRO Advanced Para-Transit Scheduling And Dispatch System. Implement an advanced para-transit scheduling and dispatch system at METRO, coordinated with TANK. Implement empty cell $1,500,000* empty cell
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 20: TANK Advanced Para-Transit Scheduling and Dispatch System
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky TANK Advanced Para-Transit Scheduling And Dispatch System. Implement an advanced para-transit scheduling and dispatch system at TANK, coordinated with METRO. empty cell Implement empty cell $750,000*
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network
12. ARTIMIS information needs to be continuously improved to ensure it is attractive to a large population

 

TRACK 3: EXPAND
Project 21: I-75 Ramp Metering within City of Cincinnati
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Ohio I-75 Ramp Metering Study ramp metering on I-75 within the City of Cincinnati. Implement ramp metering per the study, in accordance with ODOT and USDOT standards and policy. Study Implement $800,000 $4,000,000*
(including some paving costs for queue ramps)
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

1. Improve congestion around special event venues before and after events
3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network
12. ARTIMIS information needs to be continuously improved to ensure it is attractive to a large population

 

TRACK 3: EXPAND
Project 22: Bus Traffic Signal Priority
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky Bus Traffic Signal Priority Study key transit corridors for applicability of bus traffic signal priority to improve transit travel time. Implement transit signal priority on traffic signals on identified corridors. Study Implement 25 intersections $75,000 $250,000
Ohio Bus Traffic Signal Priority Study key transit corridors for applicability of bus traffic signal priority to improve transit travel time. Implement transit signal priority on traffic signals on identified corridors. Study Implement 25 intersections $75,000 $250,000

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

1. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 23: Real-Time Transit Arrival Information System
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Ohio METRO Real-Time Transit Arrival Information Expand METRO AVL capabilities to enable public access to real-time transit arrival information. Deploy signs at key bus stops/transfer points. Enable Internet access to bus arrival times by route. Implement empty cell $2,500,000* empty cell
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 24: Truck-Oriented Traveler Information Systems
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky Truck-Oriented Traveler Information Implement specialized trucker-oriented traveler information via ARTIMIS and at weigh stations approaching the region. Information on weight restrictions, transit routes, truck stops, construction and incidents specific to the trucking community would be implemented via telephone numbers, DMS and/or kiosks. Implement empty cell $750,000* empty cell
Ohio Truck-Oriented Traveler Information Implement specialized trucker-oriented traveler information via ARTIMIS and at weigh stations approaching the region. Information on weight restrictions, transit routes, truck stops, construction and incidents specific to the trucking community would be implemented via telephone numbers, DMS and/or kiosks. Implement empty cell $750,000* empty cell
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
5. Reduce the length of time that crashes block roadways
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 25: Emergency Vehicle Pre-Emption on City of Cincinnati Traffic Signals
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Ohio City of Cincinnati EVPE Install Emergency Vehicle Pre-emption on traffic signals in the City of Cincinnati. Does not include equipment for emergency vehicles. Implement at up to 100 intersections empty cell $1,100,000 empty cell

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

2. Better management of congestion caused by incidents on freeways and major arterials
3. Alleviate peak hour traffic congestion
4. Curtail behaviors that contribute to crashes
5. Reduce the length of time that crashes block roadways
6. Reduce delays to emergency vehicles on arterials
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 26: Bridge Snow and Ice Detection
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky Freeway Bridge Snow and Ice Detection Install snow and ice detection (Road Weather Information System) on key interstate bridges Implement at up to ten sites empty cell $300,000 empty cell
Ohio Freeway Bridge Snow and Ice Detection Install snow and ice detection (Road Weather Information System) on key interstate bridges Implement at up to five sites empty cell $150,000 empty cell

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 27: Research Program and Downhill Speed Detection Field Test on I-71/I-75
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky Research Program Establish a research program, in conjunction with universities, to test new implementation concepts. Suggested first project is northbound I-71/ I-75 downhill crash mitigation system in Kentucky (in Covington). Implement Implement $450,000
($150,000 per year)
$300,000
($150,000 per year)
Ohio Freeway Bridge Snow and Ice Detection Establish a research program, in conjunction with universities, to test new implementation concepts. Suggested first project is northbound I-71/ I-75 downhill crash mitigation system in Kentucky (in Covington). Implement Implement $450,000
($150,000 per year)
$300,000
($150,000 per year)

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

3. Alleviate peak hour traffic congestion
4. Curtail behaviors that contribute to crashes
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 28: Advanced Snow Plows
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Kentucky
Install snow and ice detection, management and advanced snow plow systems.
Pilot project to assess use of road weather information systems integrated with advanced technology snow plows. These systems provide early warning of icing and snow, and meter the amount of chemical and/or sand applied based on surface conditions, including amount of chemical already applied. Savings in chemical and sand, and reduction of ice and snow-related incidents are anticipated. A lead agency must be selected for this project, or the project can be implemented through the Research program, if implemented. Study empty cell $150,000 empty cell
empty cell Implement empty cell $5,000,000*
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 29: Parking Management System Around Stadiums
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Ohio Parking Management System Around Stadiums Install parking management system connecting lots and garages near stadiums with on-street DMS and/or HAR and ARTIMIS. Three levels of parking management could be evaluated. All three require information dissemination via DMS and/or HAR and ARTIMIS. The first level involves human visual assessments of parking availability, and e-mail or phoning those assessments to a central location where parking information would be disseminated. The second level involves installing automated counters at parking entrances, which relay information to the centralized system automatically for dissemination. The third level involves installing detection in every affected parking space, with the capability of guiding drivers to an exact parking space in addition to sending information to a centralized system for dissemination. A public-private partnership should be explored for deployment. Implement at up to 100 intersections empty cell $1,100,000 empty cell
empty cell empty cell empty cell empty cell
NOTE: Items marked with an asterisk (*) indicate that the costs are highly uncertain. Further study is needed to better establish cost estimates.

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

1. Improve congestion around special event venues before and after events
3. Alleviate peak hour traffic congestion
8. Lack of means to create a current picture of the regional transportation network

 

TRACK 3: EXPAND
Project 30: Red Light Running Enforcement
PROJECT DESCRIPTION CAPITAL COST ESTIMATE
0 – 6 YEARS 7 – 10 YEARS 0 – 6 YEARS 7 – 10 YEARS
Red-Light Running System State of Ohio Pilot Project to test effectiveness, fairness and legal issues related to automated red-light enforcement using cameras. Study empty cell $0 (Funded separately via State of Ohio) empty cell

Please see Table 6-3 for a complete list of ITS needs. This project’s primary function will significantly address the following ITS needs:

3. Alleviate peak hour traffic congestion
4. Curtail behaviors that contribute to crashes
8. Lack of means to create a current picture of the regional transportation network

previous page