6.1 Connecting ITS Needs to the Program PlanITS needs were discussed in more detail in Chapter 4. They are summarized in Table 6-3 below.
The remainder of this chapter summarizes thirty individual projects that are part of the Program Plan, and identifies the specific ITS needs that each project addresses. These projects are divided into Track 1 (Optimize Existing ITS), Track 2 (Integrate Systems and Agencies), and Track 3 (Expand ITS Geographic Coverage and Services). Track 1 and Track 3 respond to the needs categorized as System Needs. Track 2 responds to integration Needs. |
||||||||||||||||||||||||||||||||||||