Work Zone-Related News - Details
Date Posted: | 7/18/2013 |
---|---|
Description: | The use of accelerated bridge construction (ABC) reduces traffic impacts, improves safety, and can lower project costs. The latest Innovator newsletter highlights several recent projects in several States and an upcoming project in New York State that use ABC. FHWA is advancing three ABC technologies under the second round of Every Day Counts: prefabricated bridge elements and systems, slide-in bridge construction, and geosynthetic reinforced soil integrated bridge systems. |
URL: | http://www.fhwa.dot.gov/hfl/innovator/issue37.cfm |
Return to News Listings