Work Zone-Related News - Details
Date Posted: | 9/6/2012 |
---|---|
Description: | This FHWA report provides guidance on performance contracting for a typical reconstruction and rehabilitation project. The guide includes recommended processes and sample materials for project selection; performance goals; measurement methodology (and associated incentive/disincentive fee structure); sample enhanced low bid and best value awards; and SEP-14 applications. It also includes lessons learned and sample materials from a successful pilot project conducted by the Michigan Department of Transportation. FHWA has updated this guidance from the original version developed in 2006. |
URL: | http://www.ops.fhwa.dot.gov/wz/contracting/index.htm#pc |
Return to News Listings