Work Zone-Related News - Details
Date Posted: | 6/25/2012 |
---|---|
Description: | The Massachusetts DOT (MassDOT) recently replaced a bridge over a busy stretch of Route 9 in Wellesley in 62 hours, making it the state's fastest bridge replacement ever. MassDOT used accelerated bridge construction techniques and a design-build team to reduce project delivery time, along with an incentive/disincentive contract for crews. |
URL: | http://www.ops.fhwa.dot.gov/wz/construction/accelerated/index.htm#abc |
Return to News Listings