Significant widening of a freeway in an urban area is often impracticable due to the adjacent development and land use and physical constraints, often coupled with funding constraints. An additional lane may nevertheless be provided within the existing roadway footprint by reducing the widths of the existing lanes and/or shoulder, or using the shoulder as a part time travel lane. The use of narrow lanes to provide additional capacity and improve operations within the existing roadway footprint is not new. Brief case studies of this approach are provided below.

Narrow Lanes as Part of Freeway Modernization along I-94 in Milwaukee, Wisconsin

This Case Study illustrates how a Performance-Based Practical Design (PBPD) approach can be used to analyze and make trade-offs during the design of major freeway reconstruction in a constrained urban area — specifically, the reconstruction of I-94, the East-West freeway, in Milwaukee, WI, and the ultimate recommendation to incorporate narrow lanes and shoulders along a segment of the project.

The I-94 East-West corridor study area is located in central Milwaukee County between the downtown Milwaukee Marquette Interchange and the Zoo Interchange. This portion of the I-94 East-West Freeway corridor is comprised of six lanes, three in each direction. It plays a key role in moving commuters, tourists, freight and other movements to major sites around and beyond the Southeast region of the state. As the corridor is nearing the end of its useful life, WisDOT initiated analyses to determine how the corridor should be rebuilt to ensure that it serves the economy of Southeastern Wisconsin for decades to come. The option of merely rebuilding the six-lane freeway was eliminated early in the process based on a DOT analysis showing the need for eight lanes to reduce congestion and accommodate future traffic growth.

One segment, less than a mile in length, passes between a number of cemeteries as shown in Figure 8. As part of the screening process, two preferred alternatives were identified and scoped to avoid direct impacts to the adjacent cemeteries.

  • At-Grade Alternative: The At-grade alternative would reconstruct I-94 to eight travel lanes (four in each direction) at essentially the same elevation as the existing freeway. To avoid encroachment on the cemeteries, the reconstructed freeway mainline would include narrowing the lanes and converting the outside shoulder to a permanent fourth lane in each direction. As a result, the freeway would have less than 12-foot driving lanes between the adjacent cemeteries. Eastbound and westbound traffic would travel in 11-foot lanes for roughly 30 feet in each direction, with the lanes transitioning from 12 feet to 11 feet (and back to 12 feet) for several hundred feet east and west of the 11-foot-lane segment. The shoulder widths would vary in this segment as the available right-of-way varies (with the shoulders being as narrow as two feet). East and west of the cemeteries, the freeway would have standard 12-foot lanes and full shoulders.

    Active Traffic Management (ATM) tools — such as advance warning signs alerting drivers to the narrow lanes and narrow shoulders, and dynamic lane assignment and dynamic speed limits to warn drivers of closed lanes and reduced speeds in the narrow segment — are being considered to make the narrow lane/narrow shoulder segment operate as safe as possible.

  • Double Deck Alternative: The Double Deck alternative would reconstruct I-94 to eight travel lanes (four in each direction). A Double Deck (with one set of freeway lanes elevated over the other) would be constructed in the area between the cemeteries to avoid any direct impacts. All I-94 lanes would be 12-feet-wide under this alternative. The shoulder widths would vary slightly in this segment because insufficient right-of-way is available near the cemeteries to provide full shoulder width. East and west of the cemeteries, the freeway would have full shoulders in both directions.

Figure 8 is a picture of Milwaukee, Wisconsin. It has highway 94 running through the center. North of the highway is the Beth Hamedrosh Hagodel Cemetery. East of this cemetery is the Wood National Cemetery. South of highway 94 is the maintenance shed, the Mausoleum, and the spring hill cemetery.
Figure 8. Picture. Milwaukee, Wisconsin Case Study Project Area.
(Source: Wisconsin Department of Transportation)

Analyses were conducted for the various scenarios for the design year 2040 conditions using the proposed geometric alternatives and projected traffic data. The results of the analyses relative to the system needs and objectives are summarized below.

  • Safety: Based on a crash prediction analysis to measure the number of annual crashes, and addressing the freeway and nearby arterial streets, the double deck alternative would have fewer total crashes than the at-grade alternative (with narrow lanes and shoulders) over the 20- year analysis period. Nevertheless, the at-grade alternative would have 23 percent fewer crashes than the replace in kind alternative over the 20- year period, thereby addressing improved safety and reduced crashes on I-94.
  • Traffic Volumes and Operations: Another goal of the I-94 project is to accommodate existing and future traffic demand at an acceptable Level of Service (LOS). The at-grade and double deck alternatives would provide LOS C or D in the A.M. and P.M. peak periods in 2040, thereby satisfying this operational goal.
  • Cost: The total costs for the at-grade alternative are significantly less compared to the double deck alternative (i.e., $125 million as compared to $295 to $345 million, in 2014 dollars), and the at-grade alternative satisfies the project need and purpose.

WisDOT has identified the at-grade alternative, with narrow lanes, as the preferred alternative4 As noted in the WisDOT press release:

"The alternative selected provides the community with the best balance when all critical factors are evaluated together. We are recommending an approach which addresses the problems of crumbling infrastructure, congestion, and integration with the local street network. The at-grade alternative is the least expensive to construct and have lower potential for community and cultural resources impacts."

The 11-foot travel lanes and narrow shoulders through the cemetery area (with the At-Grade alternative) do not meet WisDOT and AASHTO criteria for the approximately 2,000-foot distance between the cemeteries and require design exceptions.

The At-Grade Alternative also requires a design exception for inadequate sight distance in the cemetery area (that is, the slight curve on I-94 through the cemeteries, combined with the 2 foot shoulders, would cause the concrete median barrier to reduce sight distance). These design exceptions do not reach a level that makes proceeding with the project in light of the stated purpose and need unreasonable, nor do they result in unacceptable safety or operational problems. Moreover, potential safety concerns with the designs could be mitigated to some extent by the inclusion of Transportation System Management and Operations (TSMO) strategies such as ATM.

In summary, this example illustrates how the use of narrow lanes and shoulders — identified and analyzed using a PBPD approach — can result in a feasible and cost-effective solution for upgrading an older urban freeway.

Narrow Lanes to Accommodate Additional Managed Lane along I-95 in Miami-Dade, Florida

I-95 from I-395 in Downtown Miami to I-595 in Broward County was comprised of four general purpose lanes and a single High Occupancy Vehicle (HOV) lane, with the separation of the HOV and general purpose lanes via striping only. The HOV lanes had an occupancy requirement of 2+ during peak hours (7-9 AM and 4-6 PM). The HOV and general purpose lanes on I-95 were operating at LOS F during peak periods. Additionally, the violation rates on the HOV lane were very high, exceeding 30 percent in many segments.

Florida DOT implemented a conversion of the facility — shown in Figure 9 — as follows:

  • Existing HOV lane converted to a High Occupancy Toll (HOT) lane
  • A second HOT lane was added by re-striping the entire facility with narrower lanes and shoulders. No new pavement was added. (Refer to diagrams in previous Figure 1)
  • The separation of the HOT lanes and the general purpose lanes is via delineators spaced 10 feet apart within a one-two foot painted buffer.
  • The occupancy limit was raised to three+

A carpool registration component of I-95 Express was developed due to the right of way constraints that prohibited a dedicated declaration lane (for occupancy verification).

The ability to leverage Florida Turnpike Enterprises electronic violation enforcement system also provided the Department with the opportunity to reduce the scope of Florida Highway Patrol (FHP) enforcement in the lanes.

Current users of the HOT lane are three+ registered carpools and buses for free; with SunPass users allowed to use the lanes and pay a toll rate which is variable in relationship to the lane usage.

The converted I-95 Express lanes have improved overall traffic conditions along the project corridor since its inception as shown in Table 6.

In summary, this example illustrates how the use of narrow lanes and shoulders within an existing roadway footprint can help increase the capacity of managed lanes and improve the operation of both the managed lanes and general purpose lanes.

Figure 9 is a photo of I-95 express lanes in Miami Dade, Florida. The express lane is separated by the remaining traffic by flex posts.
Figure 9. Photo. I-95 Express Lanes in Miami-Dade, Florida.
(Source: Google Maps / Street View)

Table 6. Average Travel Speeds Before and After I-95 Conversion.
Empty Cell Am Peak — Southbound PM Peak — Northbound
Before (2008 HOV Study) After (12 months – FY 2009–2010) Before (2008 HOV Study) After (12 months – FY 2009–2010)
General Purpose Lanes 15 mph 51 mph 15 mph 41 mph
HOV lane (Before) / Express Lane (After) 20 mph 64 mph 18 mph 56 mph

Narrow Lanes to Accommodate Part Time Shoulder Use on US 2 in Washington State

This site is located on the US-2 eastbound Trestle between the I-5 and SR-204 interchanges (MP 0.66 to MP 2.22). This segment was re-striped from a configuration consisting of 4' left shoulder, two 12' general purpose lanes and a 10' right shoulder; to a 2' left shoulder, two 11' general purpose lanes, and a 14 foot auxiliary lane/shoulder on the right, as shown in previous Figure 1. A photograph of the current configuration is shown in Figure 10.

The primary purposes for WSDOT to develop this static shoulder use were to reduce collisions in the I-5 / US-2 interchange and to keep traffic on the ramp from I-95 NB to US-2 from backing up onto the mainline of I-5 NB. The shoulder was first opened to traffic on April 6, 2009. The shoulder use operates in the PM peak period from 3:00 PM to 7:00 PM Monday through Friday. The shoulder is not open to traffic during all other time periods.

The average speeds on the I-5 NB connector to US-2 EB have improved from 10 MPH to 37 MPH during the PM period of heaviest traffic.

Figure 10 is a photo of shoulder use along US 2 in Washington State. The photo illustrates a shoulder being opened up to regular traffic.
Figure 10. Photo. Shoulder Use Along US 2 in Washington State.
(Source: Washington State Department of Transportation)

The capacity in the narrower general purpose lanes along US 2 is approximately 2,000 vphpl and the corresponding speed is approximately 50 mph. The capacity on the shoulder is approximately 1,400 vphpl and the corresponding speed is approximately 40 mph. When considered in terms of crash rates, since the shoulder was opened to traffic in the eastbound direction of US-2, the rate of crashes in terms of crashes per million vehicle miles traveled (crashes/MVMT) has decreased overall as shown in Figure 11.

Figure 11 is a graph of change in crash rate on US-2 in Washington State. The y-axis has crashes per Million VMT. The X axis has before and after bar graphs of fatal+injury rate, PDO Rate, and Total rate. The before fatal+injury rate is 0.32 and the after rate is 0.26. The before PDO Rate is 0.67 and after PDO rate is 0.55. The total before rate is 1.00 and the total after rate is 0.82.
Figure 11. Graph. Change in Crash Rate On US-2 in Washington State.
(Source: Washington State Department of Transportation)

A significant finding from the analysis of the new lane configuration is that incident clearance times on US-2 during the PM peak (when shoulder use is allowed) are significantly longer than the PM peak clearance times before shoulder use was allowed — from approximately 20 minutes to 28 minutes for all incident types combined. This is an important consideration whenever shoulders are narrowed or when a full width shoulder is used by traffic. As previously noted, (TSMO) strategies such as enhanced incident management and dynamic lane assignment may help mitigate such concerns.

In summary, this example illustrates how by narrowing travel lanes and one shoulder can help convert the other shoulder into a part-time travel lane, thereby improving operation of the facility, including reducing back-ups at an interchange. The reduction in congestion can also improve safety.

Junction Control in Los Angeles, California

Junction control is an Active Traffic Management (ATM) strategy that dynamically allocates lane access on mainline and ramp lanes in interchange areas where high traffic volumes are present, and the relative demand on the mainline and ramps change throughout the day. For off-ramp locations, this may consist of assigning lanes dynamically either for through movements, shared through-exit movements, or exit-only. For on-ramp locations, this may involve a dynamic lane reduction on the mainline upstream of a high-volume entrance ramp and/or providing an additional lane for the on ramp. Volumes on the mainline lanes and ramps are continuously monitored, and lane access is dynamically changed based on the real-time and anticipated conditions. Implementing junction control may involve narrowing lanes, and/or part time use of the ramp and/or mainline shoulder thereby resulting in a narrow or no shoulder during junction control operation.

A junction control system was installed in Los Angeles at the northbound State Route 110 connector to northbound I-5. The system required re-striping of the SR-110 mainline and the off ramp to provide a second ramp lane and an optional turn from the second mainline lane. The mainline and ramp lanes were not narrowed; but during junction control operation, there is minimal shoulder on the ramp. The project also included the installation of blank out signs allowing the lane adjacent to the exit-only lane to also be used as an exit lane (in addition to remaining a through lane) during peak periods. The new ramp configuration and signage are shown in Figure 12.

Following implementation of this junction control system, the average ramp delay reduced from greater than 20 minutes to under five minutes, and the number of crashes decreased 30 percent from the previous year prior to installation as queued vehicles now are stopped towards the end of the slower moving ramp versus being stopped on the mainline of SR-110.

In summary, this example illustrates how converting an off-ramp shoulder into a part time travel lane, and using Intelligent Transportation Systems (ITS) technologies to designate the appropriate freeway lane for both through and exit movements, can increase the capacity of an interchange during peak periods, thereby reducing ramp delay and improving safety.

Figure 12 is a photo of ramp configuration and mainline signage for junction control in Los Angeles, California. The photo illustrates a road going into a tunnel. Above the road is a sign board that says north. Next to the sign is an extinguishable message sign 'On'. On the road are illuminated raised pavement markers 'off'. The second lane operates as an optional 'thru-left' lane.
Figure 12. Photo. Ramp Configuration and Mainline Signage for Junction Control in Los Angeles, California.
(Source: Caltrans)

4As of the writing of this Primer, the preferred alternative is still going through the final environmental impact statement process.

Office of Operations