Florida (2 facilities)
Florida Table 1: Geographic and Infrastructure Characteristics
ID |
Location |
Agency |
History |
Scale |
Type |
Separation |
Urban Area |
Road |
Segment |
Year Opened |
Current Status |
# of Lanes (GP/ HOV) |
Length
(Lane-Miles/
Route-Miles) |
108 |
Miami |
I-95 |
Downtown to Golden Glades IC |
Florida DOT |
In planning |
Planning |
0 / 4 |
42.8 / 10.7 |
Separate roadway |
Barrier, elevated |
109 |
Miami-WPB UZA |
I-95 |
SR 112 to Gateway Blvd. |
Florida DOT |
1996 |
Open, Expansion in Palm Beach County |
9 / 2 |
116.0 / 58.0 |
Concurrent (median) |
Buffer |
Florida Table 2: Policy and Utilization Characteristics (NA is not available)
ID |
Location |
Eligibility |
Days/Hours of Operation |
Inter-mediate Access Allowed |
Utilization |
Peak Hour Violation Estimate |
Peak Hour Travel Time Savings (minutes) |
Urban Area |
Road |
Segment |
HOV Eligibility |
Special Fuel Eligibility |
AM Peak Hour Utilization (persons, vehicles, % of total vehicles) |
PM Peak Hour Utilization (persons, vehicles, % of total vehicles) |
108 |
Miami |
I-95 |
Downtown to Golden Glades IC |
In planning |
In planning |
In planning |
In planning |
NA |
NA |
NA |
NA |
109 |
Miami-WPB UZA |
I-95 |
SR 112 to Gateway Blvd. |
2+ |
ILEVs |
7 to 9 AM & 4 to 6 PM, both directions |
Continuous |
3500; 2138; 21.7% |
4120; 1865; 25.4% |
14% |
AM = 7 minutes, PM = 15 minutes |
Note – ID 109 (I-95): 10 mile extension opened in 2005.