Georgia (5 facilities)

Georgia Table 1: Geographic and Infrastructure Characteristics  (NA is not available)
ID Location Agency History Scale Type Separation
Urban Area Road Segment Year Opened Current Status # of Lanes (GP/ HOV) Length
(Lane-Miles/
Route-Miles)
110 Atlanta I-75 Akers Mill Road to N. Hickory Grove Road Georgia DOT Under study Under study Under study Under study Separate roadway Barrier
111 Atlanta I-575 I-75 interchange to Sixes Road Georgia DOT Preliminary engineering Preliminary engineering Preliminary engineering Preliminary engineering Separate roadway Barrier
112 Atlanta I-75 South I-285 interchange to Akers Mill Road Georgia DOT 1996 Open  NA / 1 7.5 / 7.5 Concurrent (median) Buffer
113 Atlanta I-20 Downtown to I-285 Georgia DOT 12/14/1994 Open NA / 2 17.0 / 8.5 Concurrent (median) Buffer
114 Atlanta I-85 I-75 interchange to SR 316 Georgia DOT 1996 Open NA / 2 47.8 / 23.9 Concurrent (median) Buffer

 

Georgia Table 2: Policy and Utilization Characteristics (NA is not available)
1ID Location 3Eligibility Days/Hours of Operation Inter-mediate Access Allowed Utilization Peak Hour Violation Estimate Peak Hour Travel Time Savings (minutes)
Urban Area Road Segment HOV Eligibility 4Special Fuel Eligibility AM Peak Hour Utilization (persons, vehicles, % of total vehicles) PM Peak Hour Utilization (persons, vehicles, % of total vehicles)
110 Atlanta I-75 Akers Mill Road to N. Hickory Grove Road Under study Under study Under study Yes NA NA NA NA
111 Atlanta I-575 I-75 interchange to Sixes Road Preliminary engineering Preliminary engineering Preliminary engineering Yes NA NA NA NA
2112 Atlanta I-75 South I-285 interchange to Akers Mill Road 2+ Yes 24/7 Yes NA NA NA NA
113 Atlanta I-20 Downtown to I-285 2+ Yes 24/7 Yes NA NA NA NA
114 Atlanta I-85 I-75 interchange to SR 316 2+ Yes 24/7 Yes NA NA NA NA

 

Note – ID 113 (I-20): Was originally part-time operation; is now 24/7.