Work Zone Mobility and Safety Program

Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation
A Guide for Analysts

Figure 22 Construction Impact Modeling Methodology

Pictorial representation of the methodology employed. Horizontal in form. There are seven boxes beginning with Identify Goals and Objectives. Arrows lead to each subsequent box:  Identify Select STIP projects, Run Simulation in VISUM, Build three simulation scenarios, quantify the travel impact in terms of MOEs, identify cost implication of the contracting methods, findings and conclusions.

back
Office of Operations