This appendix includes a list of the 79 resources identified and reviewed by the research team for this project, sorted by relevance (High, Moderate, or Low) in Table 6. Additionally, Table 7 lists each resource as well as which TMP strategies were evaluated within the resource.
Ref # | Title | Year | Author(s) | Relevance |
---|---|---|---|---|
1 | To Lessen Work Zone Impacts: Try TMPs | 2010 | Scriba, Symoun, Beasley | High |
6 | Work Zone Crash Analysis & Traffic Management in Work Zones – The ODOT MOT Process | ![]() |
David Holstein | High |
7 | RIDOT TMP Templates | 2009 | RIDOT | High |
8 | VDOT TMP Template and Woodrow Wilson Bridge Project TMP Example | 2007 | VDOT | High |
9 | Developing and Implementing TMPs for WZs | 2005 | ![]() |
High |
11 | Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks | 2008 | Eul-Bum Lee, Kunhee Choi, and Seungwook Lim | High |
12 | Caltrans Transportation Management Plans to Reduce Work Zone Congestion | 2007 | Caltrans | High |
13 | TMP Course, Module 9 - Evaluation and Performance | 2011 | FHWA (T. Scriba, K. Wood) | High |
20 | Revised Process for Work Zone Decision Making Based on Quantitative Performance Measures | 2009 | Hartmann, T.; Hawkins, G. | High |
25 | A Performance Assessment of Virginia's Traffic Management Plans | 2012 | Virginia Transportation Research Council | High |
26 | Techniques for Effective Highway Construction Projects in Congested Urban Areas | 2011 | Thomas R. Warne (consultant) | High |
27 | TMP Guidelines for Development, Implementation and Assessment | 2006 | MdSHA | High |
30 | Work Zone Safety and Mobility Manual(Tennessee) | 2007 | Tennessee DOT | High |
33 | Cost-Benefit Analysis of Sequential Warning Lights in Nighttime Work Zone Tapers | 2011 | Carlos Sun, Praveen Edara, Yi Hou, Andrew Robertson | High |
35 | Construction Area Late Merge (CALM) System | 2004 | Eric Meyer | High |
37 | Evaluation of the Dynamic Late Lane Merge System at Freeway Construction Work Zones | 2007 | Tapan Datta, Catherine Hartner, and Lia Grillo | High |
39 | Development and Operational Analysis of Highway Alternating Merge Transition Zones | 2009 | Wakeel Idewu | High |
40 | Evaluation of Traffic Control Devices for Rural High-Speed Maintenance Work Zones: Second Year Activities and Final Recommendations | 2000 | Michael D. Fontaine, Paul J. Carlson, and H. Gene Hawkins, Jr. | High |
44 | Evaluation of Data from Test Application of Optical Speed Bars to Highway Work Zones | 2000 | Eric Meyer | High |
45 | Evaluation of Work Zone Speed Advisory System | 2004 | Geza Pesti, Patrick T. McCoy, Mark D. Meisinger, and Vijayakumar Kannan | High |
61 | ITS in Work Zones, A Case Study: Work Zone Travel Time System | 2004 | Unknown | High |
62 | Deployment of Smart Work Zone Technology in Arkansas | 2002 | Lorie H. Tudor, Alan Meadors, Robert Plant, II | High |
65 | Development and Evaluation of an Advanced Dynamic Lane Merge Traffic Control System for three to two Lane Transition Areas in Work Zones | 2004 | Tapan Datta, Kerrie Schattler, Puskar Kar and Arpita Guha | High |
66 | Michigan DOT TMP Template | ![]() |
Michigan DOT | High |
67 | TMPs in Wisconsin | 2011 | Alicia Dougherty | High |
72 | Traffic Control Strategies for Congested Freeways and Work Zones | 2007 | Geza Pesti, Poonam Wiles, Ruey Long (Kelvin) Cheu, Praprut Songchitruksa, Jeff Shelton, Scott Cooner | High |
73 | Project Level Transportation Management Plan (TMP) Guidance Document | 2010 | Oregon DOT | High |
74 | Maximizing Investments in Work Zone Safety In Oregon | 2011 | Ross, J.; Pietz, A. | High |
75 | New York State DOT Work Zone Safety and Mobility Process Review Report August 2010 | 2010 | New York State DOT and FHWA - New York Division Office | High |
76 | Work Zone Safety and Mobility Program Review | 2010 | Iowa DOT and FHWA Iowa Division Office | High |
77 | Request for Exception to Compliance with the Work Zone Safety and Mobility Rule | 2011 | Illinois DOT | High |
78 | Evaluation of the Effectiveness of a Variable Advisory Speed System on Queue Mitigation in Work Zones | 2011 | Mitsuru Saito, Aaron Wilson | High |
79 | Work Zone Speed Reduction Utilizing Dynamic Speed Signs | 2011 | Deborah S. McAvoy | High |
2 | Simulation Models for Assessment of the Impacts of Strategies for Highway Work Zones | 2010 | Collura, J.; Heaslip, K.; Moriarty, K.; Wu, F.; Khanta, R.; Berthaume, A. | Moderate |
3 | Work Zone Design and Operation Enhancements | 2010 | John A. Gambatese and Michael Johnson | Moderate |
5 | Analyzing motorists' responses to temporary signage in highway work zones | 2009 | Yong Bai, Kris Finger, Yue Li | Moderate |
10 | Matrix-Based Decision Support Tools for Construction Activities on High-Volume Roadways | 2008 | Jodi L. Carson, Stuart D. Anderson, and Gerald L. Ullman | Moderate |
15 | Work Zone Safety and Mobility (Delaware) | 2007 | Delaware DOT | Moderate |
16 | Work Zone Safety and Mobility (Vermont) | 2007 | Vermont DOT | Moderate |
17 | Work Zone Safety and Mobility (Idaho) | 2008 | Idaho DOT | Moderate |
18 | Time Measurement of Travel Time Delay in Work Zones and Evaluation Metrics Using Bluetooth Probe Tracking | 2009 | Haseman, R.; Wasson, J.; Bullock, D. | Moderate |
19 | NCHRP 475 - A Procedure for Assessing and Planning Nighttime Highway Construction and Maintenance | 2002 | Bryden, J.; Mace, D. | Moderate |
21 | Caltrans TMP Fact Sheet | 2007 | FHWA | Moderate |
22 | Transportation Management Plan Guidelines | 2004 | Caltrans - Division of Traffic Operations | Moderate |
23 | Estimation of Traffic Mobility Impact - State of the Practice | 2006 | Praveen K. Edara, Benjamin H. Cottrell, Jr. | Moderate |
24 | Evaluation of Rural Interstate Work Zone Traffic Management Plans in Iowa Using Simulation | 2000 | Steven D. Schrock and T.H. Maze | Moderate |
28 | Dynamic Work Zone Traffic Management | 2010 | Jeremy Jackson | Moderate |
31 | Work Zone Transportation Management Plan Development Course | 2009 | Caltrans | Moderate |
32 | Transportation Management Plan (TMP) Monitoring- DelDOT's Experience | 2010 | Adam Weiser | Moderate |
34 | Development and Eval of an Advanced Dynamic Lane Merge TCD for 3-2 Lane Transition Areas in WZs | 2004 | Tapan Datta, Kerrie Schattler, Puskar Kar and Arpita Guha | Moderate |
36 | Evaluation of Speed Management Strategies in Highway Work Zones | 2006 | Yali Chen, Xiao Qin, David Noyce | Moderate |
38 | Effectiveness of Dynamic Messaging on Driver Behavior for Late Merge Lane Road Closures | 2009 | Robert Sperry, Tom McDonald, Shashi Nambisan, Ryan Pettit | Moderate |
42 | Advanced Notification Messages and Use of Sequential Portable Changeable Message Signs in Work Zones | 2005 | Gerald L. Ullman, Brooke R. Ullman, Conrad L. Dudek, Alicia Williams, and Geza Pesti | Moderate |
46 | Guidelines for the Application of Removeable Rumble Strips | 2007 | Eric Meyer | Moderate |
47 | Identification and Testing of Measures to Improve Work Zone Speed Limit Compliance | 2005 | Marcus A. Brewer, Geza Pesti, and William H. Schneider IV | Moderate |
48 | Low-Volume Highway Work Zone Evaluation of Temporary Rumble Strips | 2011 | Sun, Carlos; Edara, Praveen; Ervin, Kyle | Moderate |
50 | Radar Speed Display | 2003 | Eric Meyer | Moderate |
51 | Low-Cost Portable Video-Based Queue Detection for Work-Zone Safety | 2011 | Morris, Ted; Schwach, Jory A.; Michalopoulos, Panos G. | Moderate |
52 | Speed Monitor Display | 2000 | Tom Maze | Moderate |
53 | Speed Management Strategies for Work Zones | 2003 | Eric D. Hildebrand, Frank R. Wilson, James J. Copeland | Moderate |
54 | Real-Time Integrated ATIS Systems | 2005 | Midwest Smart Work Zone Deployment Initiative | Moderate |
55 | Radar Actuated Speed Displays | 2005 | Midwest Smart Work Zone Deployment Initiative | Moderate |
56 | Intelligent Transportation Systems in Work Zones: A Cross Cutting Study | 2002 | FHWA | Moderate |
57 | Long-Term Effectiveness of Speed Monitoring Displays in Work Zones on Rural Interstate Highways | 2001 | Geza Pesti, Patrick McCoy | Moderate |
58 | Speed Control Through Work Zones: Techniques Evaluation and Implementation Guidelines | 1987 | Errol C. Noel, Conrad L. Dudek, Olqa J. Pendleton, Huqh W. McGee, Ziad A. Sabra | Moderate |
59 | Traffic Control Strategies for Congested Freeways and Work Zones | 2007 | Geza Pesti, Poonam Wiles, Ruey Long (Kelvin) Cheu, Praprut Songchitruksa, Jeff Shelton, and Scott Cooner | Moderate |
60 | Reducing Work Zone Crashes by Using Emergency Flasher Traffic Control Device | 2009 | Yingfeng Li and Yong Bai | Moderate |
63 | Automated Work Zone Information System on Urban Freeway Rehabilitation: California Implementation | 2006 | Eul-Bum Lee, Changmo Kim | Moderate |
64 | Criteria for Portable ATIS in Work Zones | 2005 | Vikas Lachhwani and Alan J. Horowitz | Moderate |
68 | Evaluation of the Late Merge Work Zone Traffic Control Strategy | 2004 | Andrew Beacher, Michael Fontaine, Nicholas Garber | Moderate |
70 | Comparing Three Lane Merging Schemes for Short Term Work Zones - A Simulation Study | 2010 | Rami Harb, Essam Radwan, Vinayak Dixit | Moderate |
71 | Study on Intelligent Lane Merge Control System for Freeway Work Zones | 2007 | Pei Yulong, Dai Leilei | Moderate |
4 | Commuter Impacts and Behavior Changes during a Temporary Freeway Closure: The Fix I5 Project in Sacramento, California | 2010 | Liang Ye, Patricia L. Mokhtarian, Giovanni Circella | Low |
14 | Tracker, Measures of Departmental Performances | 2011 | Missouri DOT | Low |
29 | Work Zone Safety and Mobility Manual - TMP Workbook (Tennessee) | ![]() |
Tennessee DOT | Low |
41 | Wider Lane Lines | 2005 | MdSHA | Low |
43 | Experimental Alternative Highway Merge Sign | 2004 | Eric Feldblum | Low |
49 | Use of Portable Changeable Message Signs to Improve Speed Compliance | 2005 | Maryland State Highway Administration | Low |
69 | Guidelines for Using Late Merge Traffic Control in Work Zones | 2005 | Andrew Beacher, Michael Fontaine, Nicholas Garber | Low |
Name of Resource | Strategies | Strategy Selection Tools | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Queue Management | Public Outreach | ITS | Traffic Control Devices | Night Work / Off-Peak Work | Speed Management | Law Enforcement | Detours / Driver Diversion | Lane Closures | Signal Optimization | Stage Construction | PCMS | Video Detection | Real-Time Crash Data Analysis in Work Zones | Incentives / Disincentives | Simulation and Modeling | Decision-Making Matrices | |
01: To Lessen Work Zone Impacts: Try TMPs | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
02: Using Simulation Models to Assess the Impacts of Highway Work Zone Strategies: Case Studies along Interstate Highways in Massachusetts and Rhode Island | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
03: Work Zone Design and Operation Enhancements | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
04: Commuter Impacts and Behavior Changes during a Temporary Freeway Closure: The Fix I5 Project in Sacramento, California | ![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
05: Analyzing motorists' Responses to Temporary Signage in Highway Work Zones | ![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
06: Work Zone Crash Analysis & Traffic Management in Work Zones – The ODOT MOT Process | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
07: RIDOT TMP Templates and Example | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
08: Examples of Temporary Traffic Control Plans and TMP Templates | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
09: Developing and Implementing TMPs for Work Zones | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
10: Matrix-Based Decision Support Tools for Construction Activities on High-Volume Roadways | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x |
11: Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks | ![]() |
x | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | x | ![]() |
12: Caltrans Transportation Management Plans Reduce Work Zone Congestion | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
13: Traffic Management Plan Course, Module 9 – Evaluation and Performance | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
14: Tracker, Measures of Departmental Performance | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
15: Work Zone Safety and Mobility – Delaware | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
16: Work Zone Safety and Mobility – Vermont | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
17: Work Zone Safety and Mobility – Idaho | ![]() |
x | x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
18: Real-Time Measurement of Travel Time Delay in Work Zones and Evaluation Metrics Using Bluetooth Probe Tracking | x | x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
19: NCHRP Report 475 - A Procedure for Assessing and Planning Nighttime Highway Construction and Maintenance | ![]() |
![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
20: Revised Process for Work Zone Decision Making Based on Quantitative Performance Measures | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
21: Caltrans Transportation Management Plans Reduce Work Zone Congestion | x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x |
22: Transportation Management Plan Guidelines | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
23: Estimation of Traffic Mobility Impact - State of the Practice | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
24: Evaluation of Rural Interstate Work Zone Traffic Management Plans in Iowa Using Simulation | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
25: A Performance Assessment of Virginia's Traffic Management Plans | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
26: Techniques for Effective Highway Construction Projects in Congested Urban Areas | ![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
x | ![]() |
x | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
27: TMP Guidelines for Development, Implementation and Assessment | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
28: Dynamic Work Zone Traffic Management | x | ![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
29: Work Zone Safety and Mobility Manual – TMP Workbook | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
30: Work Zone Safety and Mobility Manual | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
31: TMP Guidelines | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
32: Transportation Management Plan (TMP) Monitoring- DelDOT's Experience | ![]() |
![]() |
x | x | x | ![]() |
x | x | x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
33: Cost-Benefit Analysis of Sequential Warning Lights in Nighttime Work Zone Tapers | ![]() |
![]() |
![]() |
x | x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
34: Development and Evaluation of an Advanced Dynamic Lane Merge TCD for 3-2 Lane Transition Areas in Work Zones | x | ![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
35: Construction Area Late Merge (CALM) System | ![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
36: Evaluation of Speed Management Strategies in Highway Work Zones | ![]() |
![]() |
![]() |
x | ![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
37: Evaluation of the Dynamic Late Lane Merge System at Freeway Construction Work Zones | x | ![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
38: Effectiveness of Dynamic Messaging on Driver Behavior for Late Merge Lane Road Closures | ![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
39: Development and Operational Analysis of Highway Alternating Merge Transition Zones | ![]() |
![]() |
x | x | ![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
40: Evaluation of Traffic Control Devices for Rural High-Speed Maintenance Work Zones: Second Year Activities and Final Recommendations | ![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
41: Wider Lane Lines | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
42: Advanced Notification Messages and Use of Sequential Portable Changeable Message Signs in Work Zones | ![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
43: Experimental Alternative Highway Merge Sign | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
44: Evaluation of Data from Test Application of Optical Speed Bars to Highway Work Zones | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
45: Evaluation of Work Zone Speed Advisory System | x | ![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
46: Guidelines for the Application of Removable Rumble Strips | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
47: Identification and Testing of Measures to Improve Work Zone Speed Limit Compliance | ![]() |
![]() |
x | x | ![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
48: Low Volume Highway Work Zone Evaluation of Temporary Rumble Strips | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
49: Use of Portable Changeable Message Signs with Speed Display in Work Zones | ![]() |
![]() |
![]() |
x | ![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
50: Radar Speed Display | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
51: Low-Cost Portable Video-Based Queue Detection for Work-Zone Safety | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
52: Speed Monitor Display | ![]() |
![]() |
x | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
53: Speed Management Strategies for Rural Temporary Work Zones | ![]() |
![]() |
![]() |
x | ![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
54: Real-Time Integrated ATIS Systems | ![]() |
x | x | x | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
55: Radar Actuated Speed Displays | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
56: Intelligent Transportation Systems in Work Zones: A Cross Cutting Study | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
57: Long-Term Effectiveness of Speed Monitoring Displays in Work Zones on Rural Interstate Highways | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
58: Speed Control Through Work Zones: Techniques, Evaluation, and Implementation Guidelines | ![]() |
![]() |
![]() |
![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
59: Traffic Control Strategies for Congested Freeways and Work Zones | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
60: Reducing Work Zone Crashes by Using Emergency Flasher Traffic Control Device | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
61: Intelligent Transportation Systems in Work Zones, A Case Study Work Zone Travel Time System | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
62: Deployment of Smart Work Zone Technology in Arkansas | ![]() |
![]() |
x | x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
63: Automated Work Zone Information System on Urban Freeway Rehabilitation: California Implementation | ![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
64: Criteria for Portable ATIS in Work Zones | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
65: Development and Evaluation of an Advanced Dynamic Lane Merge Traffic Control System for Three to Two Lane Transition Areas in Work Zones | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
66: Michigan DOT TMP Template | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
67: Transportation Management Plans in Wisconsin | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
68: Evaluation of the Late Merge Work Zone Traffic Control Strategy | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
69: Guidelines for Using Late Merge Traffic Control in Work Zones | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
70: Comparing Three Lane Merging Schemes for Short Term Work Zones - A Simulation Study | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
71: Study on Intelligent Lane Merge Control System for Freeway Work Zones | ![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
72: Traffic Control Strategies for Congested Freeways and Work Zones | x | ![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
73: Project Level Transportation Management Plan (TMP) Guidance Document | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
74: Maximizing Investments in Work Zone Safety in Oregon | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
75: New York State DOT Work Zone Safety and Mobility Process Review Report August 2010 | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
76: Work Zone Safety and Mobility Program Review | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
77: Request for Exception to Compliance with the Work Zone Safety and Mobility Rule | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
78: Evaluation of the Effectiveness of a Variable Advisory Speed System on Queue Mitigation in Work Zones | x | ![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
x | ![]() |
![]() |
![]() |
![]() |
![]() |
79: Work Zone Speed Reduction Utilizing Dynamic Speed Signs | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Total: | 12 | 7 | 22 | 32 | 5 | 14 | 4 | 4 | 2 | 1 | 1 | 10 | 2 | 2 | 2 | 11 | 2 |