This appendix includes a list of the 79 resources identified and reviewed by the research team for this project, sorted by relevance (High, Moderate, or Low) in Table 6. Additionally, Table 7 lists each resource as well as which TMP strategies were evaluated within the resource.
Table 6: Identified Resources by Relevance
Ref # |
Title |
Year |
Author(s) |
Relevance |
1 |
To Lessen Work Zone Impacts: Try TMPs |
2010 |
Scriba, Symoun, Beasley |
High |
6 |
Work Zone Crash Analysis & Traffic Management
in Work Zones – The ODOT MOT Process |
|
David Holstein |
High |
7 |
RIDOT TMP Templates |
2009 |
RIDOT |
High |
8 |
VDOT TMP Template and Woodrow Wilson Bridge
Project TMP Example |
2007 |
VDOT |
High |
9 |
Developing and Implementing TMPs for WZs |
2005 |
|
High |
11 |
Streamlined Strategies for Faster, Less Traffic-Disruptive
Highway Rehabilitation in Urban Networks |
2008 |
Eul-Bum Lee, Kunhee Choi, and Seungwook Lim |
High |
12 |
Caltrans Transportation Management Plans to
Reduce Work Zone Congestion |
2007 |
Caltrans |
High |
13 |
TMP Course, Module 9 - Evaluation and Performance |
2011 |
FHWA (T. Scriba, K. Wood) |
High |
20 |
Revised Process for Work Zone Decision Making
Based on Quantitative Performance Measures |
2009 |
Hartmann, T.; Hawkins, G. |
High |
25 |
A Performance Assessment of Virginia's Traffic
Management Plans |
2012 |
Virginia Transportation Research Council |
High |
26 |
Techniques for Effective Highway Construction
Projects in Congested Urban Areas |
2011 |
Thomas R. Warne (consultant) |
High |
27 |
TMP Guidelines for Development, Implementation
and Assessment |
2006 |
MdSHA |
High |
30 |
Work Zone Safety and Mobility Manual(Tennessee) |
2007 |
Tennessee DOT |
High |
33 |
Cost-Benefit Analysis of Sequential Warning
Lights in Nighttime Work Zone Tapers |
2011 |
Carlos Sun, Praveen Edara, Yi Hou, Andrew Robertson |
High |
35 |
Construction Area Late Merge (CALM) System |
2004 |
Eric Meyer |
High |
37 |
Evaluation of the Dynamic Late Lane Merge System
at Freeway Construction Work Zones |
2007 |
Tapan Datta, Catherine Hartner, and Lia Grillo |
High |
39 |
Development and Operational Analysis of Highway
Alternating Merge Transition Zones |
2009 |
Wakeel Idewu |
High |
40 |
Evaluation of Traffic Control Devices for Rural
High-Speed Maintenance Work Zones: Second Year
Activities and Final Recommendations |
2000 |
Michael D. Fontaine, Paul J. Carlson, and H.
Gene Hawkins, Jr. |
High |
44 |
Evaluation of Data from Test Application of
Optical Speed Bars to Highway Work Zones |
2000 |
Eric Meyer |
High |
45 |
Evaluation of Work Zone Speed Advisory System |
2004 |
Geza Pesti, Patrick T. McCoy, Mark D. Meisinger,
and Vijayakumar Kannan |
High |
61 |
ITS in Work Zones, A Case Study: Work Zone Travel
Time System |
2004 |
Unknown |
High |
62 |
Deployment of Smart Work Zone Technology in
Arkansas |
2002 |
Lorie H. Tudor, Alan Meadors, Robert Plant,
II |
High |
65 |
Development and Evaluation of an Advanced Dynamic
Lane Merge Traffic Control System for three to
two Lane Transition Areas in Work Zones |
2004 |
Tapan Datta, Kerrie Schattler, Puskar Kar and
Arpita Guha |
High |
66 |
Michigan DOT TMP Template |
|
Michigan DOT |
High |
67 |
TMPs in Wisconsin |
2011 |
Alicia Dougherty |
High |
72 |
Traffic Control Strategies for Congested Freeways
and Work Zones |
2007 |
Geza Pesti, Poonam Wiles, Ruey Long (Kelvin)
Cheu, Praprut Songchitruksa, Jeff Shelton, Scott
Cooner |
High |
73 |
Project Level Transportation Management Plan
(TMP) Guidance Document |
2010 |
Oregon DOT |
High |
74 |
Maximizing Investments in Work Zone Safety In
Oregon |
2011 |
Ross, J.; Pietz, A. |
High |
75 |
New York State DOT Work Zone Safety and Mobility
Process Review Report August 2010 |
2010 |
New York State DOT and FHWA - New York Division
Office |
High |
76 |
Work Zone Safety and Mobility Program Review |
2010 |
Iowa DOT and FHWA Iowa Division Office |
High |
77 |
Request for Exception to Compliance with the
Work Zone Safety and Mobility Rule |
2011 |
Illinois DOT |
High |
78 |
Evaluation of the Effectiveness of a Variable
Advisory Speed System on Queue Mitigation in Work
Zones |
2011 |
Mitsuru Saito, Aaron Wilson |
High |
79 |
Work Zone Speed Reduction Utilizing Dynamic
Speed Signs |
2011 |
Deborah S. McAvoy |
High |
2 |
Simulation Models for Assessment of the Impacts
of Strategies for Highway Work Zones |
2010 |
Collura, J.; Heaslip, K.; Moriarty, K.; Wu,
F.; Khanta, R.; Berthaume, A. |
Moderate |
3 |
Work Zone Design and Operation Enhancements |
2010 |
John A. Gambatese and Michael Johnson |
Moderate |
5 |
Analyzing motorists' responses to temporary
signage in highway work zones |
2009 |
Yong Bai, Kris Finger, Yue Li |
Moderate |
10 |
Matrix-Based Decision Support Tools for Construction
Activities on High-Volume Roadways |
2008 |
Jodi L. Carson, Stuart D. Anderson, and Gerald
L. Ullman |
Moderate |
15 |
Work Zone Safety and Mobility (Delaware) |
2007 |
Delaware DOT |
Moderate |
16 |
Work Zone Safety and Mobility (Vermont) |
2007 |
Vermont DOT |
Moderate |
17 |
Work Zone Safety and Mobility (Idaho) |
2008 |
Idaho DOT |
Moderate |
18 |
Time Measurement of Travel Time Delay in Work
Zones and Evaluation Metrics Using Bluetooth Probe
Tracking |
2009 |
Haseman, R.; Wasson, J.; Bullock, D. |
Moderate |
19 |
NCHRP 475 - A Procedure for Assessing and Planning
Nighttime Highway Construction and Maintenance |
2002 |
Bryden, J.; Mace, D. |
Moderate |
21 |
Caltrans TMP Fact Sheet |
2007 |
FHWA |
Moderate |
22 |
Transportation Management Plan Guidelines |
2004 |
Caltrans - Division of Traffic Operations |
Moderate |
23 |
Estimation of Traffic Mobility Impact - State
of the Practice |
2006 |
Praveen K. Edara, Benjamin H. Cottrell, Jr. |
Moderate |
24 |
Evaluation of Rural Interstate Work Zone Traffic
Management Plans in Iowa Using Simulation |
2000 |
Steven D. Schrock and T.H. Maze |
Moderate |
28 |
Dynamic Work Zone Traffic Management |
2010 |
Jeremy Jackson |
Moderate |
31 |
Work Zone Transportation Management Plan Development
Course |
2009 |
Caltrans |
Moderate |
32 |
Transportation Management Plan (TMP) Monitoring-
DelDOT's Experience |
2010 |
Adam Weiser |
Moderate |
34 |
Development and Eval of an Advanced Dynamic
Lane Merge TCD for 3-2 Lane Transition Areas in
WZs |
2004 |
Tapan Datta, Kerrie Schattler, Puskar Kar and
Arpita Guha |
Moderate |
36 |
Evaluation of Speed Management Strategies in
Highway Work Zones |
2006 |
Yali Chen, Xiao Qin, David Noyce |
Moderate |
38 |
Effectiveness of Dynamic Messaging on Driver
Behavior for Late Merge Lane Road Closures |
2009 |
Robert Sperry, Tom McDonald, Shashi Nambisan,
Ryan Pettit |
Moderate |
42 |
Advanced Notification Messages and Use of Sequential
Portable Changeable Message Signs in Work Zones |
2005 |
Gerald L. Ullman, Brooke R. Ullman, Conrad L.
Dudek, Alicia Williams, and Geza Pesti |
Moderate |
46 |
Guidelines for the Application of Removeable
Rumble Strips |
2007 |
Eric Meyer |
Moderate |
47 |
Identification and Testing of Measures to Improve
Work Zone Speed Limit Compliance |
2005 |
Marcus A. Brewer, Geza Pesti, and William H.
Schneider IV |
Moderate |
48 |
Low-Volume Highway Work Zone Evaluation of Temporary
Rumble Strips |
2011 |
Sun, Carlos; Edara, Praveen; Ervin, Kyle |
Moderate |
50 |
Radar Speed Display |
2003 |
Eric Meyer |
Moderate |
51 |
Low-Cost Portable Video-Based Queue Detection
for Work-Zone Safety |
2011 |
Morris, Ted; Schwach, Jory A.; Michalopoulos,
Panos G. |
Moderate |
52 |
Speed Monitor Display |
2000 |
Tom Maze |
Moderate |
53 |
Speed Management Strategies for Work Zones |
2003 |
Eric D. Hildebrand, Frank R. Wilson, James J.
Copeland |
Moderate |
54 |
Real-Time Integrated ATIS Systems |
2005 |
Midwest Smart Work Zone Deployment Initiative |
Moderate |
55 |
Radar Actuated Speed Displays |
2005 |
Midwest Smart Work Zone Deployment Initiative |
Moderate |
56 |
Intelligent Transportation Systems in Work Zones:
A Cross Cutting Study |
2002 |
FHWA |
Moderate |
57 |
Long-Term Effectiveness of Speed Monitoring
Displays in Work Zones on Rural Interstate Highways |
2001 |
Geza Pesti, Patrick McCoy |
Moderate |
58 |
Speed Control Through Work Zones: Techniques
Evaluation and Implementation Guidelines |
1987 |
Errol C. Noel, Conrad L. Dudek, Olqa J. Pendleton,
Huqh W. McGee, Ziad A. Sabra |
Moderate |
59 |
Traffic Control Strategies for Congested Freeways
and Work Zones |
2007 |
Geza Pesti, Poonam Wiles, Ruey Long (Kelvin)
Cheu, Praprut Songchitruksa, Jeff Shelton, and
Scott Cooner |
Moderate |
60 |
Reducing Work Zone Crashes by Using Emergency
Flasher Traffic Control Device |
2009 |
Yingfeng Li and Yong Bai |
Moderate |
63 |
Automated Work Zone Information System on Urban
Freeway Rehabilitation: California Implementation
|
2006 |
Eul-Bum Lee, Changmo Kim |
Moderate |
64 |
Criteria for Portable ATIS in Work Zones |
2005 |
Vikas Lachhwani and Alan J. Horowitz |
Moderate |
68 |
Evaluation of the Late Merge Work Zone Traffic
Control Strategy |
2004 |
Andrew Beacher, Michael Fontaine, Nicholas Garber |
Moderate |
70 |
Comparing Three Lane Merging Schemes for Short
Term Work Zones - A Simulation Study |
2010 |
Rami Harb, Essam Radwan, Vinayak Dixit |
Moderate |
71 |
Study on Intelligent Lane Merge Control System
for Freeway Work Zones |
2007 |
Pei Yulong, Dai Leilei |
Moderate |
4 |
Commuter Impacts and Behavior Changes during
a Temporary Freeway Closure: The Fix I5 Project
in Sacramento, California |
2010 |
Liang Ye, Patricia L. Mokhtarian, Giovanni Circella |
Low |
14 |
Tracker, Measures of Departmental Performances |
2011 |
Missouri DOT |
Low |
29 |
Work Zone Safety and Mobility Manual - TMP Workbook
(Tennessee) |
|
Tennessee DOT |
Low |
41 |
Wider Lane Lines |
2005 |
MdSHA |
Low |
43 |
Experimental Alternative Highway Merge Sign |
2004 |
Eric Feldblum |
Low |
49 |
Use of Portable Changeable Message Signs to
Improve Speed Compliance |
2005 |
Maryland State Highway Administration |
Low |
69 |
Guidelines for Using Late Merge Traffic Control
in Work Zones |
2005 |
Andrew Beacher, Michael Fontaine, Nicholas Garber |
Low |
Table 7: Relevant Strategies Evaluated in Each Literature Review Resource
Name of Resource |
Strategies |
Strategy Selection Tools |
Queue Management |
Public Outreach |
ITS |
Traffic Control Devices |
Night Work / Off-Peak Work |
Speed Management |
Law Enforcement |
Detours / Driver Diversion |
Lane Closures |
Signal Optimization |
Stage Construction |
PCMS |
Video Detection |
Real-Time Crash Data Analysis in Work Zones |
Incentives / Disincentives |
Simulation and Modeling |
Decision-Making Matrices |
01: To Lessen Work Zone Impacts: Try TMPs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
02: Using Simulation Models to Assess the Impacts
of Highway Work Zone Strategies: Case Studies
along Interstate Highways in Massachusetts and
Rhode Island |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
x |
|
03: Work Zone Design and Operation Enhancements |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
04: Commuter Impacts and Behavior Changes during
a Temporary Freeway Closure: The Fix I5 Project
in Sacramento, California |
|
x |
|
|
|
|
|
x |
|
|
|
|
|
|
|
x |
|
05: Analyzing motorists' Responses to Temporary
Signage in Highway Work Zones |
|
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
06: Work Zone Crash Analysis & Traffic Management
in Work Zones – The ODOT MOT Process |
x |
|
|
|
|
|
|
|
|
|
|
|
|
x |
|
|
|
07: RIDOT TMP Templates and Example |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
08: Examples of Temporary Traffic Control Plans
and TMP Templates |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
09: Developing and Implementing TMPs for Work
Zones |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10: Matrix-Based Decision Support Tools for
Construction Activities on High-Volume Roadways |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
x |
11: Streamlined Strategies for Faster, Less
Traffic-Disruptive Highway Rehabilitation in Urban
Networks |
|
x |
|
|
x |
|
|
|
|
|
|
|
|
|
x |
x |
|
12: Caltrans Transportation Management Plans
Reduce Work Zone Congestion |
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13: Traffic Management Plan Course, Module 9
– Evaluation and Performance |
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14: Tracker, Measures of Departmental Performance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15: Work Zone Safety and Mobility – Delaware
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16: Work Zone Safety and Mobility – Vermont
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17: Work Zone Safety and Mobility – Idaho |
|
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
18: Real-Time Measurement of Travel Time Delay
in Work Zones and Evaluation Metrics Using Bluetooth
Probe Tracking |
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
19: NCHRP Report 475 - A Procedure for Assessing
and Planning Nighttime Highway Construction and
Maintenance |
|
|
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
20: Revised Process for Work Zone Decision Making
Based on Quantitative Performance Measures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
21: Caltrans Transportation Management Plans
Reduce Work Zone Congestion |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
x |
22: Transportation Management Plan Guidelines |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23: Estimation of Traffic Mobility Impact -
State of the Practice |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
x |
|
24: Evaluation of Rural Interstate Work Zone
Traffic Management Plans in Iowa Using Simulation |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
x |
|
25: A Performance Assessment of Virginia's Traffic
Management Plans |
|
|
|
|
|
|
|
|
|
|
x |
|
|
|
|
|
|
26: Techniques for Effective Highway Construction
Projects in Congested Urban Areas |
|
|
|
|
x |
|
|
|
x |
|
x |
|
|
|
x |
|
|
27: TMP Guidelines for Development, Implementation
and Assessment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
28: Dynamic Work Zone Traffic Management |
x |
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
29: Work Zone Safety and Mobility Manual – TMP
Workbook |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30: Work Zone Safety and Mobility Manual |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
31: TMP Guidelines |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
32: Transportation Management Plan (TMP) Monitoring-
DelDOT's Experience |
|
|
x |
x |
x |
|
x |
x |
x |
x |
|
|
|
|
|
|
|
33: Cost-Benefit Analysis of Sequential Warning
Lights in Nighttime Work Zone Tapers |
|
|
|
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
34: Development and Evaluation of an Advanced
Dynamic Lane Merge TCD for 3-2 Lane Transition
Areas in Work Zones |
x |
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
35: Construction Area Late Merge (CALM) System |
|
|
x |
x |
|
|
|
|
|
|
|
|
|
x |
|
|
|
36: Evaluation of Speed Management Strategies
in Highway Work Zones |
|
|
|
x |
|
x |
x |
|
|
|
|
|
|
|
|
|
|
37: Evaluation of the Dynamic Late Lane Merge
System at Freeway Construction Work Zones |
x |
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
38: Effectiveness of Dynamic Messaging on Driver
Behavior for Late Merge Lane Road Closures |
|
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
39: Development and Operational Analysis of
Highway Alternating Merge Transition Zones |
|
|
x |
x |
|
x |
|
|
|
|
|
|
|
|
|
|
|
40: Evaluation of Traffic Control Devices for
Rural High-Speed Maintenance Work Zones: Second
Year Activities and Final Recommendations |
|
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
41: Wider Lane Lines |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
42: Advanced Notification Messages and Use of
Sequential Portable Changeable Message Signs in
Work Zones |
|
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
43: Experimental Alternative Highway Merge Sign |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
44: Evaluation of Data from Test Application
of Optical Speed Bars to Highway Work Zones |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
x |
|
45: Evaluation of Work Zone Speed Advisory System |
x |
|
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
46: Guidelines for the Application of Removable
Rumble Strips |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
47: Identification and Testing of Measures to
Improve Work Zone Speed Limit Compliance |
|
|
x |
x |
|
x |
|
|
|
|
|
|
|
|
|
|
|
48: Low Volume Highway Work Zone Evaluation
of Temporary Rumble Strips |
|
|
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
49: Use of Portable Changeable Message Signs
with Speed Display in Work Zones |
|
|
|
x |
|
x |
|
|
|
|
|
x |
|
|
|
|
|
50: Radar Speed Display |
|
|
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
51: Low-Cost Portable Video-Based Queue Detection
for Work-Zone Safety |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
52: Speed Monitor Display |
|
|
x |
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
53: Speed Management Strategies for Rural Temporary
Work Zones |
|
|
|
x |
|
x |
|
|
|
|
|
x |
|
|
|
|
|
54: Real-Time Integrated ATIS Systems |
|
x |
x |
x |
|
|
|
x |
|
|
|
x |
|
|
|
|
|
55: Radar Actuated Speed Displays |
|
|
|
|
|
x |
|
|
|
|
|
x |
|
|
|
|
|
56: Intelligent Transportation Systems in Work
Zones: A Cross Cutting Study |
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
57: Long-Term Effectiveness of Speed Monitoring
Displays in Work Zones on Rural Interstate Highways |
|
|
|
|
|
x |
|
|
|
|
|
x |
|
|
|
|
|
58: Speed Control Through Work Zones: Techniques,
Evaluation, and Implementation Guidelines |
|
|
|
|
|
x |
x |
|
|
|
|
|
|
|
|
|
|
59: Traffic Control Strategies for Congested
Freeways and Work Zones |
x |
|
|
|
|
|
|
|
|
|
|
x |
x |
|
|
|
|
60: Reducing Work Zone Crashes by Using Emergency
Flasher Traffic Control Device |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
61: Intelligent Transportation Systems in Work
Zones, A Case Study Work Zone Travel Time System |
|
|
x |
|
|
|
|
|
|
|
|
|
x |
|
|
|
|
62: Deployment of Smart Work Zone Technology
in Arkansas |
|
|
x |
x |
|
|
|
|
|
|
|
x |
|
|
|
|
|
63: Automated Work Zone Information System on
Urban Freeway Rehabilitation: California Implementation |
|
x |
|
|
|
|
|
x |
|
|
|
|
|
|
|
|
|
64: Criteria for Portable ATIS in Work Zones |
|
|
x |
|
|
|
|
|
|
|
|
x |
|
|
|
|
|
65: Development and Evaluation of an Advanced
Dynamic Lane Merge Traffic Control System for
Three to Two Lane Transition Areas in Work Zones |
|
|
|
x |
|
|
x |
|
|
|
|
|
|
|
|
|
|
66: Michigan DOT TMP Template |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
67: Transportation Management Plans in Wisconsin |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
68: Evaluation of the Late Merge Work Zone Traffic
Control Strategy |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
x |
|
69: Guidelines for Using Late Merge Traffic
Control in Work Zones |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
x |
|
70: Comparing Three Lane Merging Schemes for
Short Term Work Zones - A Simulation Study |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
x |
|
71: Study on Intelligent Lane Merge Control
System for Freeway Work Zones |
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
x |
|
72: Traffic Control Strategies for Congested
Freeways and Work Zones |
x |
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
x |
|
73: Project Level Transportation Management
Plan (TMP) Guidance Document |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
74: Maximizing Investments in Work Zone Safety
in Oregon |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
75: New York State DOT Work Zone Safety and
Mobility Process Review Report August 2010 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
76: Work Zone Safety and Mobility Program Review |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
77: Request for Exception to Compliance with
the Work Zone Safety and Mobility Rule |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
78: Evaluation of the Effectiveness of a Variable
Advisory Speed System on Queue Mitigation in Work
Zones |
x |
|
|
|
|
x |
|
|
|
|
|
x |
|
|
|
|
|
79: Work Zone Speed Reduction Utilizing Dynamic
Speed Signs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total: |
12 |
7 |
22 |
32 |
5 |
14 |
4 |
4 |
2 |
1 |
1 |
10 |
2 |
2 |
2 |
11 |
2 |