Work Zone Mobility and Safety Program

Description of Slide 52. FLow Rates: EB 92 @ San Mateo-Hayward Bridge, Labor Day Weekend, Saturday 2005 vs 2006, EB Bay Bridge Closed

Slide 52. FLow Rates: EB 92 @ San Mateo-Hayward Bridge, Labor Day Weekend, Saturday 2005 vs 2006, EB Bay Bridge Closed

Graph showing flow rates for eastbound 92 at San Mateo-Hayward Bridge for a 24-hour period on Saturday, September 3, 2005, and Saturday, September 2, 2006, with the eastbound Bay Bridge closed. The graph shows a decrease in flow from 1,500 vehicles per hour (vph) in 2005 and 2,000 vph in 2006 at 12:01 A.M. to 1,000 vph in 2005 and 2006 at 4 A.M., increasing to 3,000 vph in 2005 and 4,300 vph in 2006 at 12 P.M. and decreasing to 1,500 vph in 2005 and 2,100 vph in 2006 at 11:59 P.M.

Office of Operations