The data shown in figure 4 are provided in the table below.

Section 2010 2011
4.3.1 10.7 10.7
4.3.2 10.9 11.2
4.3.3 11.1 11.4
4.3.4 11.6 12.1
4.3.5 8.6 9.3
4.3.6 10.9 11.2
4.3.7 9 9.1
4.3.8 10.6 10.7
4.3.9 12.2 12.5
4.3.10 10 10.2
4.3.11 7.6 7.8
4.3.12 9.6 9.8