Figure 3. Results for Project Planning and Programming Section

The data shown in figure 3 are provided in the table below.

Section 2010 2011
4.2.1 8.5 8.6
4.2.2 8.4 8.6
4.2.3 8.7 8.9
4.2.4 8.8 9.0
4.2.5 8.9 9.0
4.2.6 9.1 9.2

Return to Figure 3.