The data shown in figure 3 are provided in the table below.

Section 2007 2008
4.2.1 6.7 7.5
4.2.2 7.2 7.9
4.2.3 7.9 8.2
4.2.4 7.9 8.4
4.2.5 8 8.3
4.2.6 8.1 8.7