Systems Engineering for ITS
Example View By DeliverableExample View By Deliverable
Click to Sort by Project

Example systems engineering documents were collected from many different ITS projects to support development of this website. This view provides access to the collected examples, organized by deliverable. Note that these real world examples are not perfect, but you still may find them helpful. We are always looking for good examples, so please Contact Us if you or your agency may have additional examples to share.


Show All

Name: California SERF – Transit Vehicle Signal Priority
Description: This document is an example of a Systems Engineering Review Form (SERF) that provides responses to the federal regulatory requirements in 23 CFR 940 part 11. For this high-risk ("Major") ITS projects, completion of responses will occur during the system definition phase of the systems engineering process.
Project: Other
Access: https://www.arc-it.net/seforits/files/other/sampserfld.pdf(Opens in a new window)

Name: CDOT SEA Assessment Checklist
Description: The CDOT systems engineering analysis process includes a series of Word templates for the key SEA documents. The first template is the Technology/SEA Assessment Checklist that project managers use to determine the scope of the SEA for their particular project.
Project: CDOT Systems Engineering Analysis Guidance
Access: https://www.codot.gov/programs/intelligent-transportation-systems/systems-engineering-analysis-sea/sea-documents(Opens in a new window)

Name: FDOT Systems Engineering Project Checklist
Description: This checklist (FDOT Form #750-040-06) is used to show an ITS Project is compliant with 23 CFR 940 and an FDOT procedure (#750-040-003) for system engineering. This is version 1 of the checklist, dated 10/10/2017. Visit the FDOT website if you need the latest version.
Project: FDOT Systems Engineering Guidance
Access: https://www.arc-it.net/seforits/files/fdot/w75004006_v001.pdf(Opens in a new window)

Name: MnDOT Systems Engineering Overview
Description: This is the primary entry point that provides links to the Highway Project Development Process, a decision tree tool, a quick reference with step-by-step instructions, and a detailed set of checklists for most common ITS projects. The example content includes Concepts of Operation, Requirements, and Test Plans for many types of projects that are grouped by class. If you are looking for systems engineering information for most types of typical ITS projects, you are likely to find it in this broad collection of ITS technical resources.
Project: Minnesota DOT Systems Engineering Guidance
Access: https://www.dot.state.mn.us/its/systemsengineering.html(Opens in a new window)

Name: NYC Transit Signal Priority SEA Final Report
Description: This document is an update to the "Transit Signal Priority Project Systems Engineering Analysis Report (TSP PSEAR)" dated January 2015. This update includes NYC central Traffic Signal Priority (TSP) developments since January 2015, including alignment with the 2018 update of the NYC Sub-regional Intelligent Transportation System (ITS) Architecture (NYCSRA). The NYCSRA 2018 update, in turn, incorporates dataflows recommended in the 2015 TSP PSEAR relevant service packages. This report is written for systems engineering staff responsible for overseeing ITS programs. It includes information for constructing and deploying the system which provides the foundation for system operation and future configuration management.
Project: New York City Transit Signal Priority
Access: https://www.arc-it.net/seforits/files/nyctsp/TspPsear2019UpdateFinalv5.pdf(Opens in a new window)

Name: Pennsylvania Adaptive Signal Control System Evaluation
Description: This document is used to properly evaluate and streamline the Systems Engineering Process for Adaptive Signal Control Systems. This document follows guidance provided by the Federal Highway Administration's (FHWA) Model Systems Engineering Documents for Adaptive Signal Control Technology (ASCT) Systems (FHWA-HOP-11-027) and PennDOT's direction for adaptive signal systems in Publication 46. Upon completing this document, the appropriate needs, requirements, and evaluation of acceptable vendor products, a recommendation will be made based on the information and technology available when this evaluation was completed.
Project: Pennsylvania Systems Engineering Guidance
Access: https://www.arc-it.net/seforits/files/penndot/pennascse.pdf(Opens in a new window)

Name: Tennessee Procedures for Implementing ITS Regulation 23CFR940
Description: This document provides step by step procedures and guidelines for meeting Rule 940 for ITS projects in Tennessee. It includes guidance for different types of ITS projects and includes a Systems Engineering Analysis form that is completed that is sufficient for basic ITS projects.
Project: Other
Access: https://www.arc-it.net/seforits/files/other/tnitsproc.pdf(Opens in a new window)