Figure 87 Long Description

Figure 87. I-80 Eastbound Existing Conditions

Figure 87 is a diagram that details the existing conditions or preconstruction configuration of Interstate 80 eastbound. At one end of the study area, Interstate 80 eastbound consists of five lanes approaching a Collector-Distributor Road that provides access to the Garden State Parkway and Saddle River Road. The section then becomes a four-lane section that eventually turned into a split configuration consisting of two express lanes and two local lanes.