This figure is a graphic illustration of an example infrastructure layout applied to the Main Gate vehicle processing situation at Fort Hood. In the figure, there are six lanes inbound, one truck inspection lane, and a lane to return denied vehicles and trucks. The inbound processing infrastructure includes a canopy over all lanes with a gatehouse on the left side of the processing area. This graphical representation was used to illustrate a potential solution and discuss requirements for security, surveillance, infrastructure, and cargo inspection.