Office of Operations Freight Management and Operations

SAFETEA_LU Designated Projects by State -- National Corridor Infrastructure Improvement Program

Table Excel Version - 26KB

To view Excel files, you can use the Microsoft Excel Viewer.

Acronyms

Million (M)
Estimated (est.)


Designated Projects by State -- National Corridor Infrastructure Improvement Program

Alaska

  • Total Projects: 1
  • Total Funding*: $30M
  • Project List: Planning, Design and Construction of Knik Arm Bridge **
  • Annual Funding Levels
    • 2005: $3.0M
    • 2006: $6.0M
    • 2007: $7.5M
    • 2008: $7.5M
    • 2009: $6.0M
  • Annual Obligation Limitation
    • 2005: $2.565M
    • 2006: $5.226M (est.)
    • 2007: $6.375M (est.)
    • 2008: $6.375M (est.)
    • 2009: $5.100M (est.)

Arkansas

  • Total Projects: 3
  • Total Funding*: $135M
  • Project List: Construction of extension of I-530 from Pine Bluff to Wilmar, ton interstate specs [40]; Planning, Design and Construction of the I-49/Bella Vista Bypass [20]; I-69 Corridor, including Great River Bridge [75]
  • Annual Funding Levels
    • 2005: $13.5M
    • 2006: $27.0M
    • 2007: $33.8M
    • 2008: $33.8M
    • 2009: $27.0M
  • Annual Obligation Limitation
    • 2005: $11.543M
    • 2006: $23.517M (est.)
    • 2007: $28.688M (est.)
    • 2008: $28.688M (est.)
    • 2009: $22.950M (est.)

Arizona

  • Total Projects: 1
  • Total Funding*: $3M
  • Project List: State Route 85 Upgrade
  • Annual Funding Levels
    • 2005: $0.3M
    • 2006: $0.6M
    • 2007: $0.8M
    • 2008: $0.8M
    • 2009: $0.6M
  • Annual Obligation Limitation
    • 2005: $0.257M
    • 2006: $0.523M (est.)
    • 2007: $0.638M (est.)
    • 2008: $0.638M (est.)
    • 2009: $0.510M (est.)

California

  • Total Projects: 6
  • Total Funding*: $660M
  • Project List: Centennial Corridor Loop in Bakersfield [330]; Design, Planning and Construction of State Route 178 in Bakersfield [100]; Widening of Rosedale Highway between SR43 and SR99 in Bakersfield and widening of SR178between SR99 and D Street in Bakersfield [60]; Increase capacity on I-80 between Sacramento/Placer County line and SR65 [50]; I-405 HOV lane [100]; SR4 East Upgrade [20]
  • Annual Funding Levels
    • 2005: $66.0M
    • 2006: $132.0M
    • 2007: $165.0M
    • 2008: $165.0M
    • 2009: $132.0M
  • Annual Obligation Limitation
    • 2005: $56.430M
    • 2006: $114.972M (est.)
    • 2007: $140.250M (est.)
    • 2008: $140.250M (est.)
    • 2009: $112.200M (est.)

Colorado

  • Total Projects: 1
  • Total Funding*: $3M
  • Project List: US 287 Ports-to-Plains Corridor
  • Annual Funding Levels
    • 2005: $0.3M
    • 2006: $0.6M
    • 2007: $0.8M
    • 2008: $0.8M
    • 2009: $0.6M
  • Annual Obligation Limitation
    • 2005: $0.257M
    • 2006: $0.523M (est.)
    • 2007: $0.638M (est.)
    • 2008: $0.638M (est.)
    • 2009: $0.510M (est.)

Connecticut

  • Total Projects: 1
  • Total Funding*: $35M
  • Project List: Pearl Harbor Memorial Bridge
  • Annual Funding Levels
    • 2005: $3.5M
    • 2006: $7.0M
    • 2007: $8.8M
    • 2008: $8.8M
    • 2009: $7.0M
  • Annual Obligation Limitation
    • 2005: $2.993M
    • 2006: $6.097M (est.)
    • 2007: $7.438M (est.)
    • 2008: $7.438M (est.)
    • 2009: $5.950M (est.)

District of Columbia

  • Total Projects: 1
  • Total Funding*: $75M
  • Project List: Frederick Douglass Memorial Bridge
  • Annual Funding Levels
    • 2005: $7.5M
    • 2006: $15.0M
    • 2007: $18.8M
    • 2008: $18.8M
    • 2009: $15.0M
  • Annual Obligation Limitation
    • 2005: $6.413M
    • 2006: $13.065M (est.)
    • 2007: $15.938M (est.)
    • 2008: $15.938M (est.)
    • 2009: $12.750M (est.)

Illinois

  • Total Projects: 2
  • Total Funding*: $207M
  • Project List: Construction of US I-80 to I-88 N-S Connector [152]; Construction of Route 34 Interchange and Improvements [55]
  • Annual Funding Levels
    • 2005: $20.7M
    • 2006: $41.4M
    • 2007: $51.8M
    • 2008: $51.8M
    • 2009: $41.4M
  • Annual Obligation Limitation
    • 2005: $17.699M
    • 2006: $36.059M (est.)
    • 2007: $43.988M (est.)
    • 2008: $43.988M (est.)
    • 2009: $35.190M (est.)

Indiana

  • Total Projects: 1
  • Total Funding*: $10
  • Project List: State Road 312, Hammond
  • Annual Funding Levels
    • 2005: $1.0M
    • 2006: $2.0M
    • 2007: $2.5M
    • 2008: $2.5M
    • 2009: $2.0M
  • Annual Obligation Limitation
    • 2005: $0.855M
    • 2006: $1.742M (est.)
    • 2007: $2.125M (est.)
    • 2008: $2.125M (est.)
    • 2009: $1.700M (est.)

Louisiana

  • Total Projects: 5
  • Total Funding*: $230M
  • Project List: Improvements to LA Highway 1 between Caminada Bridge and the LA1-US90 interchange [20]; Construction of 36 mi. segment of I-49 between AR state line and I-220 in Shreveport [150]; LA1 Replacement [5]; Construction of I-49 North from I-220 in Shreveport to AR state line [27.5]; Transportation improvements to I-49 South [27.5]
  • Annual Funding Levels
    • 2005: $23.0M
    • 2006: $46.0M
    • 2007: $57.5M
    • 2008: $57.5M
    • 2009: $46.0M
  • Annual Obligation Limitation
    • 2005: $19.665M
    • 2006: $40.066M (est.)
    • 2007: $48.875M (est.)
    • 2008: $48.875M (est.)
    • 2009: $39.100M (est.)

Maryland

  • Total Projects: 1
  • Total Funding*: $10M
  • Project List: Planning, Design and Construction of the ICC in Montgomery and PG Counties
  • Annual Funding Levels
    • 2005: $1.0M
    • 2006: $2.0M
    • 2007: $2.5M
    • 2008: $2.5M
    • 2009: $2.0M
  • Annual Obligation Limitation
    • 2005: $0.855M
    • 2006: $1.742M (est.)
    • 2007: $2.125M (est.)
    • 2008: $2.125M (est.)
    • 2009: $1.700M (est.)

Minnesota

  • Total Projects: 1
  • Total Funding*: $50M
  • Project List: Falls-to-Falls corridor
  • Annual Funding Levels
    • 2005: $5.0M
    • 2006: $10.0M
    • 2007: $12.5M
    • 2008: $12.5M
    • 2009: $10.0M
  • Annual Obligation Limitation
    • 2005: $4.275M
    • 2006: $8.710M (est.)
    • 2007: $10.625M (est.)
    • 2008: $10.625M (est.)
    • 2009: $8.500M (est.)

Oklahoma

  • Total Projects: 2
  • Total Funding*: $145M
  • Project List: Ports-to-Plains Corridor [35]; OK I-44 from Riverside to Yale Ave. in Tulsa [110]
  • Annual Funding Levels
    • 2005: $14.5M
    • 2006: $29.0M
    • 2007: $36.3M
    • 2008: $36.3M
    • 2009: $29.0M
  • Annual Obligation Limitation
    • 2005: $12.398M
    • 2006: $25.259M (est.)
    • 2007: $30.813M (est.)
    • 2008: $30.813M (est.)
    • 2009: $24.650M (est.)

South Carolina

  • Total Projects: 1
  • Total Funding*: $10M
  • Project List: Planning, Design and Construction of the I-73 Corridor of National Significance
  • Annual Funding Levels
    • 2005: $1.0M
    • 2006: $2.0M
    • 2007: $2.5M
    • 2008: $2.5M
    • 2009: $2.0M
  • Annual Obligation Limitation
    • 2005: $0.855M
    • 2006: $1.742M (est.)
    • 2007: $2.125M (est.)
    • 2008: $2.125M (est.)
    • 2009: $1.700M (est.)

Tennessee

  • Total Projects: 1
  • Total Funding*: $100M
  • Project List: Design, ROW and Construction of I-69
  • Annual Funding Levels
    • 2005: $10.0M
    • 2006: $20.0M
    • 2007: $25.0M
    • 2008: $25.0M
    • 2009: $20.0M
  • Annual Obligation Limitation
    • 2005: $8.550M
    • 2006: $17.420M (est.)
    • 2007: $21.250M (est.)
    • 2008: $21.250M (est.)
    • 2009: $17.000M (est.)

Virginia

  • Total Projects: 1
  • Total Funding*: $100M
  • Project List: Construction of dedicated truck lanes on additional capacity on I-81
  • Annual Funding Levels
    • 2005: $10.0M
    • 2006: $20.0M
    • 2007: $25.0M
    • 2008: $25.0M
    • 2009: $20.0M
  • Annual Obligation Limitation
    • 2005: $8.550M
    • 2006: $17.420M (est.)
    • 2007: $21.250M (est.)
    • 2008: $21.250M (est.)
    • 2009: $17.000M (est.)

Wisconsin

  • Total Projects: 1
  • Total Funding*: $30M
  • Project List: Construction and Reconstruction of US Highway 41 corridor between Milwaukee and Green Bay
  • Annual Funding Levels
    • 2005: $3.0M
    • 2006: $6.0M
    • 2007: $7.5M
    • 2008: $7.5M
    • 2009: $6.0M
  • Annual Obligation Limitation
    • 2005: $2.565M
    • 2006: $5.226M (est.)
    • 2007: $6.375M (est.)
    • 2008: $6.375M (est.)
    • 2009: $5.100M (est.)

West Virginia

  • Total Projects: 1
  • Total Funding*: $50M
  • Project List: I-73/I-74 Corridor
  • Annual Funding Levels
    • 2005: $5.0M
    • 2006: $10.0M
    • 2007: $12.5M
    • 2008: $12.5M
    • 2009: $10.0M
  • Annual Obligation Limitation
    • 2005: $4.275M
    • 2006: $8.710M (est.)
    • 2007: $10.625M (est.)
    • 2008: $10.625M (est.)
    • 2009: $8.500M (est.)

Iowa (IA), Illinois (IL)

  • Total Projects: 1
  • Total Funding*: $15M
  • Project List: Planning, Design, ROW acquisition and Construction of I-74 Bridge from Bettendorf, IA to Moline, IL
  • Annual Funding Levels
    • 2005: $1.5M
    • 2006: $3.0M
    • 2007: $3.8M
    • 2008: $3.8M
    • 2009: $3.0M
  • Annual Obligation Limitation
    • 2005: $1.283M
    • 2006: $2.613M (est.)
    • 2007: $3.188M (est.)
    • 2008: $3.188M (est.)
    • 2009: $2.550M (est.)

Texas, Arkansas, Mississippi, Tennessee, Kentucky, Indiana, [Louisiana]

  • Total Projects: 1
  • Total Funding*: $50M
  • Project List: Planning, Design and Construction of I-69 (TX, LA, AR, MS, TN, KY, IN)
  • Annual Funding Levels
    • 2005: $5.0M
    • 2006: $10.0M
    • 2007: $12.5M
    • 2008: $12.5M
    • 2009: $10.0M
  • Annual Obligation Limitation
    • 2005: $4.275M
    • 2006: $8.710M (est.)
    • 2007: $10.625M (est.)
    • 2008: $10.625M (est.)
    • 2009: $8.500M (est.)

Total of States Projects

  • Total Projects: 33
  • Total Funding*: $1,948M
  • Annual Funding Levels
    • 2005: $194.8M
    • 2006: $389.6M
    • 2007: $487.0M
    • 2008: $487.0M
    • 2009: $389.6M
  • Annual Obligation Limitation
    • 2005: $166.554M
    • 2006: $339.342M (est.)
    • 2007: $413.950M (est.)
    • 2008: $413.950M (est.)
    • 2009: $331.160M (est.)

* The funding levels in this column equal the totals authorized in SAFETEA-LU section 1302, however, the funding is subject to obligation limitation set in annual Appropriations Acts. (back to text)

** Section 186 of the FY 2006 DOT Appropriations Act (P.L. 109-115) modified the use of all SAFETEA-LU earmarks for the Knik Arm bridge. The funds are to be made available to the Alaska DOT for any purpose under 23 USC 133(b) (STP). (back to text)

Office of Operations