List of Tables

Table 1.1 Handbook Usage Recommendations
Table 2.1 Use of CM by System Classification
Table 2.2 Elements of CM Plans
Table 2.3 CM Plan Resources
Table 2.4 Average Benefits Ratings for CM (Scale: 0 – 10)
Table 2.5 Average Cost Ratings for CM (Scale 0 – 10)
Table 3.1 CHART II Naming Scheme
Table 3.2 Priority Corridor Unique IDs
Table 3.3 CHART II Change Levels
Table 3.4 CHART II CMO Actions
Table 3.5 CHART II CSA Reports
Table 5.1 Baselines in the System Life Cycle
Table 5.2 CHART II Project Baselines
Table 6.1 Georgia NaviGAtor CM Team
Table 7.1 CM and the System Life Cycle
Table 7.2 Traceability Matrix
Table 7.3 Revised Traceability Matrix
Table 8.1 Manufacturers Evaluated
Table 8.2 Supplier Comparison Matrix
Table 8.3 Final Product Comparisons
Table C.1 CM Team Responsibilities by Member
Table C.2 SCR Submittal Timeline