Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation
A Guide for Analysts
Work Zone Analysis Scoring Worksheet
Develop a Transportation Modeling Approach
|
Sketch-Planning and HCM Methodologies |
Travel Demand Models |
Traffic Signal Optimization |
Macroscopic Simulation |
Mesoscopic Simulation |
Microscopic Simulation |
---|---|---|---|---|---|---|
Work Zone Characteristics |
||||||
Type |
|
|
|
|
|
|
Network Configuration |
|
|
|
|
|
|
Size |
|
|
|
|
|
|
Analysis Area |
|
|
|
|
|
|
Agency Resources |
||||||
Institutional |
|
|
|
|
|
|
Technical Staff |
|
|
|
|
|
|
Funding |
|
|
|
|
|
|
Schedule |
|
|
|
|
|
|
Performance Measures |
||||||
Travel Time |
|
|
|
|
|
|
Delay |
|
|
|
|
|
|
Queue Length |
|
|
|
|
|
|
Speed |
|
|
|
|
|
|
Volume |
|
|
|
|
|
|
User Cost |
|
|
|
|
|
|
Incidents |
|
|
|
|
|
|
Cumulative Impacts |
|
|
|
|
|
|
Data |
||||||
Type |
|
|
|
|
|
|
Source |
|
|
|
|
|
|
Quality |
|
|
|
|
|
|
Transportation ManagementPlan |
||||||
Control Strategies |
|
|
|
|
|
|
Traffic Control Devices |
|
|
|
|
|
|
Project Innovation |
|
|
|
|
|
|
Motorist Information |
|
|
|
|
|
|
Demand Mgmt Strategies |
|
|
|
|
|
|
Corridor/Network Management |
|
|
|
|
|
|
Work Safety Management |
|
|
|
|
|
|
Traffic/Incident Management |
|
|
|
|
|
|
SUMMARY |
|
|
|
|
|
|
= Transportation modeling approach address work zone factor.
= Transportation modeling approach may or may not address work zone factor.
= Transportation modeling approach does not address work zone factor.
Identify a Strategic Methodology
Where are you in the project life-cycle? |
|
---|---|
Planning |
Multi-scale or Screening |
PE/Design |
Multi-scale or Screening |
Construction |
Mono-scale |
Are there other key decisions that will need to be made? |
|
---|---|
Yes |
Multi-scale or Screening |
No |
Mono-scale |
Is there uncertainty in the scale of the work zone type? |
|
---|---|
Yes |
Screening |
No |
Multi-scale or Mono-scale |