Work Zone Mobility and Safety Program

Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation
A Guide for Analysts

Figure 40 Yosemite Case Study Area

Photograph of the Yosemite Valley with the main road highlighted. Superimposed is the QuickZone network with 12 nodes. Six important points are indicate: Project limits west at node 1. Wawona Road Intersection at node 2. El Capitan Crossover at node 3.  Outbound Change to 1-way at node 5. Sentinel Drive Crossover between nodes 6 and 7. Project limits (east) at node 8.

back
Office of Operations