Work Zone Mobility and Safety Program

Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation
A Guide for Analysts

Figure 17 GTSR Rehabilitation Project

This figure depicts the analysis sections. There are eight analysis sections.  The network is based upon the GTSR road and is quite convoluted following the grade and mountains in the park.  The road starts at the west entrance in the bottom left and ends with St. Mary’s Entrance at the top right.

back
Office of Operations