Work Zone Mobility and Safety Program

Long Description: Figure 5. Results for Project Construction and Operation Section

The data shown in figure 5 are provided in the table below.

Section 2007 2008
4.4.1 9.1 9.5
4.4.2 9.8 10.3
4.4.3 10.7 10.8
4.4.4 7.1 7.2
4.4.5 10.1 10.7
4.4.6 9.8 9.9
4.4.7 12.6 12.8
4.4.8 11.3 11.5
4.4.9 5.5 6.6


Return to Figure 5.

Office of Operations