Road Weather Management Program
photos of lightning, trucks plowing snow, an empty road before a storm, and an evacuation
Office of Operations 21st century operations using 21st century technologies

Best Practices for Road Weather Management Version 2.0

Title:

Ice-Pavement Bond Disbonding: Fundamental Study

Abstract:

This fundamental study of the ice-pavement bond structure and the mechanics of its formation provides a basis for the development of techniques and devices for destroying or disrupting the ice-pavement bond once it has formed. The destruction process of the ice-substrate bond is explored. The report also characterizes the physical and chemical processes that cause deterioration in the bond formed between ice and asphalt and portland cement concretes. Finally, the report makes recommendations for further work to develop practical solutions for destroying the ice-pavement bond.

Source(s):

Midwest Research Institute, South Dakota School of Mines and Technology, SRI International and Surface Research and Applications; Prepared for Stategic Highway Research Program (SHRP)

http://onlinepubs.trb.org/Onlinepubs/shrp/SHRP-H-643.pdf

Date: 1993

Author:

Blackburn, Ashworth, Schmidt, Kinzig

Keywords:


Ice/Frost

PDF files can be viewed with the Acrobat® Reader®.

Office of Operations