I-35W & Mississippi River Bridge Anti-icing Project: Operational Evaluation Report
Abstract:
A bridge that spans the Mississippi River on US Interstate 35W in Minneapolis, Minnesota has been fitted with a computerized system that sprays potassium acetate, an anti-icing chemical, on the bridge deck when data from environmental sensors indicate that hazardous winter driving conditions are imminent.