Office of Operations
21st Century Operations Using 21st Century Technologies

Long Description: Figure 14. Data Collection/Integration/Sharing

4.3.1.1 Does the TIM program use a Traffic Management Center/Traffic Operations Center (TMC/TOC) to coordinate incident detection, notification and response?

  • Baseline: 1.98
  • 2010: 3.22

4.3.1.2 Is public safety co-located with transportation in the TMC/TOC?

  • Baseline: 1.88
  • 2010: 1.95

4.3.1.3 Has the TIM program achieved TMC-CAD integration so that incident data and video information is transferred between agencies and applications?

  • Baseline: 1.43
  • 2010: 2.10

4.3.1.4 Does the TIM program have specific policies and procedures for traffic management during incident response (i.e. signal timing changes, opening/closing of HOV lanes/ramp metering)?

  • Baseline: 1.55
  • 2010: 2.08

4.3.1.5 Does the TIM program provide for interoperable, interagency communications on-site between incident responders?

  • Baseline: 1.61
  • 2010: 2.54

Return to Figure 14.