Benefit Cost Analysis – Road Weather Management

Long Description for Figure 1.

Figure shows a four step process. 1 - Identify Road-Weather Applications. 2 - Benefit-Cost Analysis: Safety. 3 - Assumption Vetting. 4 - Benefit-Cost Analysis: Mobility, Environmental, Cost Savings. The last two steps are highlighted as Phase 2. Step 4 loops back to Step 2 to revisit and improve.