Figure 1. GTC's Mode-Specific Project Evaluation Criteria for TSMO Projects

List of 4 System Management and Operations Criteria and ratings:

  1. Reduce travel times on major roadways. Scored 0-10.
  2. Reduce incident clearance times. Scored 0-10.
  3. Increase the productivity of regional transportation agencies / providers (e.g., cost savings, time savings, etc.) Scored 0-5.
  4. Support or advance existing and /or proposed ITS elements. Scored 0-5.