Long Description for Figure 2: I-205 SMART Corridor Phase 1 Construction Contract Title Sheet

The image is of a plan design for the Central Valley Gateway ITS Project. The graphic is blurry and much of it is not readible. The title reads "State of California Department of Transportation: Project Plans for Construction on State Highway in San Joaquin County Near Tracy from Stanislaus County Line to Alameda County Line. In the upper right corner is a general map of the state of California. In the left corner is a table that reads:

SHEET NO. DESCRIPTION
1 TITLE AND LOCATION MAP
2-6 TYPICAL CROSS SECTIONS
7 KEY MAP LINE INDEX
8 PROJECT CONTROL
9-25 LAYOUTS
26-51 CONSTRUCTION DETAILS
52-68 TEMPORARY WATER POLLUTION CONTROL PLANS AND QUANTITIES
69-87 DRAINAGE PLANS, DETAILS AND QUANTITIES
88 LIABILITY PLAN
89-90 CONSTRUCTION AREA SIGNS
91-97 MOTORIST INFORMATION PLANS
98-99 TRAFFIC HANDLING PLAN AND QUANTITIES
100-119 PAVEMENT DELINEATION & SIGN PLANS, DETAILS AND QUANTITIES
120-125 SUMMARY OF QUANTITIES
126-144 EROSION CONTROL LEGEND, PLANS, DETAILS AND QUANTITIES
145-206 ELECTRICAL PLANS, DETAILS AND QUANTITIES
207-261 REVISED STANDARD PLANS
282-285 STRUCTURAL PLANS

The standard plans list applicable to this contract is included in the notice to riders and special provisions book.

In the bottom center is a mostly inelegible map of the roads to be worked on. Some areas are marked. These markings read:

Begin Construction - Sta. "B1" 525 +00 PM L.0.0

Location of Construction - 132 EB Off-Ramp STA "C1" 75+75 PM O.2

Location of Construction - 132 EB On-Ramp Sta. "C4" 377-98 PM 0.2

Begin Work (Rte 5) - Sta "W" 1459+46

End Work (Rte 580) - PM 0.8

End Construction - PM 15.3