Orange County Integrated Regional Mobility - Smart District
Printable Version [PDF, 14MB]
You may need the Adobe® Reader® to view the PDFs on this page.
Contact Information: Operations Feedback at OperationsFeedback@dot.gov
U.S. Department of Transportation
Federal Highway Administration
Office of Operations
1200 New Jersey Avenue, SE
Washington, DC 20590
Table of Contents
List of Figures
Figure 1: | Project Location "Triangle" |
---|---|
Figure 2: | High Level System Architecture |
Figure 3: | EcoTrafix GUI |
Figure 4: | DSS Operational Concept |
Figure 5: | Streetline Hybrid Platform Data Inputs |
Figure 6: | Base Connected Vehicle Subsystem Features |
Figure 7: | CV-based TSP Feature |
Figure 8: | FluidHub Connects Mobility Offerings and Provides Users a Seamless Travel Experience |
Figure 9: | Deployment Phasing |
Figure 10: | 36 month proposed schedule |
Figure 11: | Organizational Structure |
List of Tables
Table 1: | Key Outcome-Related Performance Measures |
---|