US 50 Integrated Corridor Management – Sacramento Region

Cover Page

Project Name US 50 Integrated Corridor Management Project
Eligible Entity Applying to Receive Federal Funding California Department of
Transportation
Total Project Cost (from all sources) $32,510,000
ATCMTD Request $12,000,000
Are Matching Funds restricted to a specific component? If so,
which one?
No
State(s) in which the project is located California
Is the project currently programmed in the:
  • Transportation Improvement Program (TIP)
  • Statewide Transportation Improvement Program (STIP)
  • MPO Long Range Transportation Plan
  • State Long Range Transportation Plan
The US 50 ICM Project will be programmed in the State Highway System Management Plan, which is the long-range plan for the State Highway Operation and Protection Program (SHOPP).
Technologies Proposed to be Deployed
  • Arterial Management System (AMS) Integration – System Detection, Bluetooth Readers, Traveler Information Signs, Signal Central System Upgrades, and Stop Sign to Signal Upgrades
  • Signal Controller Upgrades
  • Signal Cabinet and Communication Upgrades
  • HOV Ramp Metering Modifications, Intersection Video Surveillance upgrades
  • Signal Central System
  • Ramp Metering Central System
  • Dynamic Corridor Ramp Metering
  • Fiber Optics
  • ICM System integration and upgrades