Office of Operations Freight Management and Operations

SAFETEA_LU Designated Projects by State -- National Corridor Infrastructure Improvement Program

Table Excel Version - 26KB

To view Excel files, you can use the Microsoft Excel Viewer.

Acronyms

Million (M)
Estimated (est.)


Designated Projects by State -- National Corridor Infrastructure Improvement Program

Alaska

  • Total Projects: 1
  • Total Funding*: $30M
  • Project List: Planning, Design and Construction of Knik Arm Bridge **
  • Annual Funding Levels
    • 2005: $3.0M
    • 2006: $6.0M
    • 2007: $7.5M
    • 2008: $7.5M
    • 2009: $6.0M
  • Annual Obligation Limitation
    • 2005: $2.565M
    • 2006: $5.226M (est.)
    • 2007: $6.375M (est.)
    • 2008: $6.375M (est.)
    • 2009: $5.100M (est.)

Arkansas

  • Total Projects: 3
  • Total Funding*: $135M
  • Project List: Construction of extension of I-530 from Pine Bluff to Wilmar, ton interstate specs [40]; Planning, Design and Construction of the I-49/Bella Vista Bypass [20]; I-69 Corridor, including Great River Bridge [75]
  • Annual Funding Levels
    • 2005: $13.5M
    • 2006: $27.0M
    • 2007: $33.8M
    • 2008: $33.8M
    • 2009: $27.0M
  • Annual Obligation Limitation
    • 2005: $11.543M
    • 2006: $23.517M (est.)
    • 2007: $28.688M (est.)
    • 2008: $28.688M (est.)
    • 2009: $22.950M (est.)

Arizona

  • Total Projects: 1
  • Total Funding*: $3M
  • Project List: State Route 85 Upgrade
  • Annual Funding Levels
    • 2005: $0.3M
    • 2006: $0.6M
    • 2007: $0.8M
    • 2008: $0.8M
    • 2009: $0.6M
  • Annual Obligation Limitation
    • 2005: $0.257M
    • 2006: $0.523M (est.)
    • 2007: $0.638M (est.)
    • 2008: $0.638M (est.)
    • 2009: $0.510M (est.)

California

  • Total Projects: 6
  • Total Funding*: $660M
  • Project List: Centennial Corridor Loop in Bakersfield [330]; Design, Planning and Construction of State Route 178 in Bakersfield [100]; Widening of Rosedale Highway between SR43 and SR99 in Bakersfield and widening of SR178between SR99 and D Street in Bakersfield [60]; Increase capacity on I-80 between Sacramento/Placer County line and SR65 [50]; I-405 HOV lane [100]; SR4 East Upgrade [20]
  • Annual Funding Levels
    • 2005: $66.0M
    • 2006: $132.0M
    • 2007: $165.0M
    • 2008: $165.0M
    • 2009: $132.0M
  • Annual Obligation Limitation
    • 2005: $56.430M
    • 2006: $114.972M (est.)
    • 2007: $140.250M (est.)
    • 2008: $140.250M (est.)
    • 2009: $112.200M (est.)

Colorado

  • Total Projects: 1
  • Total Funding*: $3M
  • Project List: US 287 Ports-to-Plains Corridor
  • Annual Funding Levels
    • 2005: $0.3M
    • 2006: $0.6M
    • 2007: $0.8M
    • 2008: $0.8M
    • 2009: $0.6M
  • Annual Obligation Limitation
    • 2005: $0.257M
    • 2006: $0.523M (est.)
    • 2007: $0.638M (est.)
    • 2008: $0.638M (est.)
    • 2009: $0.510M (est.)

Connecticut

  • Total Projects: 1
  • Total Funding*: $35M
  • Project List: Pearl Harbor Memorial Bridge
  • Annual Funding Levels
    • 2005: $3.5M
    • 2006: $7.0M
    • 2007: $8.8M
    • 2008: $8.8M
    • 2009: $7.0M
  • Annual Obligation Limitation
    • 2005: $2.993M
    • 2006: $6.097M (est.)
    • 2007: $7.438M (est.)
    • 2008: $7.438M (est.)
    • 2009: $5.950M (est.)

District of Columbia

  • Total Projects: 1
  • Total Funding*: $75M
  • Project List: Frederick Douglass Memorial Bridge
  • Annual Funding Levels
    • 2005: $7.5M
    • 2006: $15.0M
    • 2007: $18.8M
    • 2008: $18.8M
    • 2009: $15.0M
  • Annual Obligation Limitation
    • 2005: $6.413M
    • 2006: $13.065M (est.)
    • 2007: $15.938M (est.)
    • 2008: $15.938M (est.)
    • 2009: $12.750M (est.)

Illinois

  • Total Projects: 2
  • Total Funding*: $207M
  • Project List: Construction of US I-80 to I-88 N-S Connector [152]; Construction of Route 34 Interchange and Improvements [55]
  • Annual Funding Levels
    • 2005: $20.7M
    • 2006: $41.4M
    • 2007: $51.8M
    • 2008: $51.8M
    • 2009: $41.4M
  • Annual Obligation Limitation
    • 2005: $17.699M
    • 2006: $36.059M (est.)
    • 2007: $43.988M (est.)
    • 2008: $43.988M (est.)
    • 2009: $35.190M (est.)

Indiana

  • Total Projects: 1
  • Total Funding*: $10
  • Project List: State Road 312, Hammond
  • Annual Funding Levels
    • 2005: $1.0M
    • 2006: $2.0M
    • 2007: $2.5M
    • 2008: $2.5M
    • 2009: $2.0M
  • Annual Obligation Limitation
    • 2005: $0.855M
    • 2006: $1.742M (est.)
    • 2007: $2.125M (est.)
    • 2008: $2.125M (est.)
    • 2009: $1.700M (est.)

Louisiana

  • Total Projects: 5
  • Total Funding*: $230M
  • Project List: Improvements to LA Highway 1 between Caminada Bridge and the LA1-US90 interchange [20]; Construction of 36 mi. segment of I-49 between AR state line and I-220 in Shreveport [150]; LA1 Replacement [5]; Construction of I-49 North from I-220 in Shreveport to AR state line [27.5]; Transportation improvements to I-49 South [27.5]
  • Annual Funding Levels
    • 2005: $23.0M
    • 2006: $46.0M
    • 2007: $57.5M
    • 2008: $57.5M
    • 2009: $46.0M
  • Annual Obligation Limitation
    • 2005: $19.665M
    • 2006: $40.066M (est.)
    • 2007: $48.875M (est.)
    • 2008: $48.875M (est.)
    • 2009: $39.100M (est.)

Maryland

  • Total Projects: 1
  • Total Funding*: $10M
  • Project List: Planning, Design and Construction of the ICC in Montgomery and PG Counties
  • Annual Funding Levels
    • 2005: $1.0M
    • 2006: $2.0M
    • 2007: $2.5M
    • 2008: $2.5M
    • 2009: $2.0M
  • Annual Obligation Limitation
    • 2005: $0.855M
    • 2006: $1.742M (est.)
    • 2007: $2.125M (est.)
    • 2008: $2.125M (est.)
    • 2009: $1.700M (est.)

Minnesota

  • Total Projects: 1
  • Total Funding*: $50M
  • Project List: Falls-to-Falls corridor
  • Annual Funding Levels
    • 2005: $5.0M
    • 2006: $10.0M
    • 2007: $12.5M
    • 2008: $12.5M
    • 2009: $10.0M
  • Annual Obligation Limitation
    • 2005: $4.275M
    • 2006: $8.710M (est.)
    • 2007: $10.625M (est.)
    • 2008: $10.625M (est.)
    • 2009: $8.500M (est.)

Oklahoma

  • Total Projects: 2
  • Total Funding*: $145M
  • Project List: Ports-to-Plains Corridor [35]; OK I-44 from Riverside to Yale Ave. in Tulsa [110]
  • Annual Funding Levels
    • 2005: $14.5M
    • 2006: $29.0M
    • 2007: $36.3M
    • 2008: $36.3M
    • 2009: $29.0M
  • Annual Obligation Limitation
    • 2005: $12.398M
    • 2006: $25.259M (est.)
    • 2007: $30.813M (est.)
    • 2008: $30.813M (est.)
    • 2009: $24.650M (est.)

South Carolina

  • Total Projects: 1
  • Total Funding*: $10M
  • Project List: Planning, Design and Construction of the I-73 Corridor of National Significance
  • Annual Funding Levels
    • 2005: $1.0M
    • 2006: $2.0M
    • 2007: $2.5M
    • 2008: $2.5M
    • 2009: $2.0M
  • Annual Obligation Limitation
    • 2005: $0.855M
    • 2006: $1.742M (est.)
    • 2007: $2.125M (est.)
    • 2008: $2.125M (est.)
    • 2009: $1.700M (est.)

Tennessee

  • Total Projects: 1
  • Total Funding*: $100M
  • Project List: Design, ROW and Construction of I-69
  • Annual Funding Levels
    • 2005: $10.0M
    • 2006: $20.0M
    • 2007: $25.0M
    • 2008: $25.0M
    • 2009: $20.0M
  • Annual Obligation Limitation
    • 2005: $8.550M
    • 2006: $17.420M (est.)
    • 2007: $21.250M (est.)
    • 2008: $21.250M (est.)
    • 2009: $17.000M (est.)

Virginia

  • Total Projects: 1
  • Total Funding*: $100M
  • Project List: Construction of dedicated truck lanes on additional capacity on I-81
  • Annual Funding Levels
    • 2005: $10.0M
    • 2006: $20.0M
    • 2007: $25.0M
    • 2008: $25.0M
    • 2009: $20.0M
  • Annual Obligation Limitation
    • 2005: $8.550M
    • 2006: $17.420M (est.)
    • 2007: $21.250M (est.)
    • 2008: $21.250M (est.)
    • 2009: $17.000M (est.)

Wisconsin

  • Total Projects: 1
  • Total Funding*: $30M
  • Project List: Construction and Reconstruction of US Highway 41 corridor between Milwaukee and Green Bay
  • Annual Funding Levels
    • 2005: $3.0M
    • 2006: $6.0M
    • 2007: $7.5M
    • 2008: $7.5M
    • 2009: $6.0M
  • Annual Obligation Limitation
    • 2005: $2.565M
    • 2006: $5.226M (est.)
    • 2007: $6.375M (est.)
    • 2008: $6.375M (est.)
    • 2009: $5.100M (est.)

West Virginia

  • Total Projects: 1
  • Total Funding*: $50M
  • Project List: I-73/I-74 Corridor
  • Annual Funding Levels
    • 2005: $5.0M
    • 2006: $10.0M
    • 2007: $12.5M
    • 2008: $12.5M
    • 2009: $10.0M
  • Annual Obligation Limitation
    • 2005: $4.275M
    • 2006: $8.710M (est.)
    • 2007: $10.625M (est.)
    • 2008: $10.625M (est.)
    • 2009: $8.500M (est.)

Iowa (IA), Illinois (IL)

  • Total Projects: 1
  • Total Funding*: $15M
  • Project List: Planning, Design, ROW acquisition and Construction of I-74 Bridge from Bettendorf, IA to Moline, IL
  • Annual Funding Levels
    • 2005: $1.5M
    • 2006: $3.0M
    • 2007: $3.8M
    • 2008: $3.8M
    • 2009: $3.0M
  • Annual Obligation Limitation
    • 2005: $1.283M
    • 2006: $2.613M (est.)
    • 2007: $3.188M (est.)
    • 2008: $3.188M (est.)
    • 2009: $2.550M (est.)

Texas, Arkansas, Mississippi, Tennessee, Kentucky, Indiana, [Louisiana]

  • Total Projects: 1
  • Total Funding*: $50M
  • Project List: Planning, Design and Construction of I-69 (TX, LA, AR, MS, TN, KY, IN)
  • Annual Funding Levels
    • 2005: $5.0M
    • 2006: $10.0M
    • 2007: $12.5M
    • 2008: $12.5M
    • 2009: $10.0M
  • Annual Obligation Limitation
    • 2005: $4.275M
    • 2006: $8.710M (est.)
    • 2007: $10.625M (est.)
    • 2008: $10.625M (est.)
    • 2009: $8.500M (est.)

Total of States Projects

  • Total Projects: 33
  • Total Funding*: $1,948M
  • Annual Funding Levels
    • 2005: $194.8M
    • 2006: $389.6M
    • 2007: $487.0M
    • 2008: $487.0M
    • 2009: $389.6M
  • Annual Obligation Limitation
    • 2005: $166.554M
    • 2006: $339.342M (est.)
    • 2007: $413.950M (est.)
    • 2008: $413.950M (est.)
    • 2009: $331.160M (est.)

* The funding levels in this column equal the totals authorized in SAFETEA-LU section 1302, however, the funding is subject to obligation limitation set in annual Appropriations Acts. (back to text)

** Section 186 of the FY 2006 DOT Appropriations Act (P.L. 109-115) modified the use of all SAFETEA-LU earmarks for the Knik Arm bridge. The funds are to be made available to the Alaska DOT for any purpose under 23 USC 133(b) (STP). (back to text)

  Last modified: March 23, 2020  
Office of Operations