Lane Closure Analysis
| State | Document Title | Subcategory | Participating Organization |
|---|---|---|---|
| Florida | Lane Closure Analysis for Toll Roads | Closure Effects | FDOT |
| Florida | Lane Closure Policy: On the Interstate, maintain the existing number of through travel lanes in the work area; in no case less than two lanes. | Closure Policy | FDOT |
| Florida | Work Zone Performance Measures for Minimizing Delay Period/Queue Length | Performance Goals and Measures | FDOT |
| Indiana | Comparisons of the estimated construction time required to maintain traffic through the work zone vs. closing the highway and diverting the traffic. | Tools and Practice | INDOT |
| Utah | Tool: MENUTP Corridor Modeling | Corridor Planning | UDOT |
