Managing Lane Closure
| Practice Title | Category | Subcategory | State |
|---|---|---|---|
| Lane Closure Coordinator | Policy and Procedures | Closure Policy | Virginia |
| Removal of Traffic Control Pattern if Not Working Multiple Shifts | Policy and Procedures | Traffic Management Planning |
Pennsylvania, Federal Highways |
| Guidelines for Use of Flaggers in Highway Work Zones | Policy and Procedures | Traffic Management Planning |
Massachusetts, Federal Highways |
| Quick Change Moveable Barrier™ | Project Development/Design | Tools and Practice |
Illinois, Indiana |
| Coordination of Road Closure/Detours During Construction | Project Development/Design | Tools and Practice | North Carolina |
| 'Rolling Roadblock' Method for Total Road Closure | Construction/Maintenance Materials, Methods, and Specifications | Construction Methods | Florida |
| Disincentive Specification for Failure to Remove Lane Closures | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control | California |
| Moving Lane Closures and Tapers at Mid−Day | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control | Illinois |
| Certified Worksite Traffic Control Supervisors Required | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control | Ohio |
| Standard Specification that Requires the Contractor to Correct Deficient Traffic Control | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control | Illinois |
| 45 mph Posted Speed When Flashing | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control | Indiana |
| Indiana Lane Merge | ITS and Innovative Technology | Traffic Control | Indiana |
