Skip to content | ||
Freeway Management and Operations Handbook |
||
Description of Figure 7-3: Metered RampFigure 7-3 shows a two-lane ramp with mastarm - mounted signals (one signal head over each lane), plus a post mounted signal on the left side of the ramp. |
||
US DOT Home | FHWA Home | Operations Home | TMC Pooled-Fund Study | Privacy Policy |